Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 603
Message text: Number of selected activities: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT603
- Number of selected activities: &1 ?The SAP error message /SAPAPO/CDPSOPT603 with the text "Number of selected activities: &1" typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning functionalities. This error indicates that the number of selected activities exceeds the system's defined limits or thresholds.
Cause: Exceeding Limits: The error is triggered when the number of activities selected for processing exceeds the maximum limit set in the system configuration. Configuration Settings: The system may have specific settings that restrict the number of activities that can be processed at one time to ensure performance and stability. Data Volume: Large volumes of data or complex planning scenarios can lead to this error if the system is unable to handle the number of selected activities efficiently.
Solution: Reduce Selected Activities: Try to reduce the number of activities you are selecting for processing. This can be done by filtering the activities based on
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT602
Number of activities for optimization: &1
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT601
Number of resources: &1, number of which selected: &2
What causes this issue? There are &V1& resources in <DS:GLOS.3588358C0A8515DCE10000009B38F9B9>SAP LiveCache</>. However, optimiza...
/SAPAPO/CDPSOPT604
Number of activities after preprocessing: &1
What causes this issue? After the preprocessing, &V1& activities can still be rescheduled for optimization (not <DS:TX.OPTIMIERUNG_FIXIERT...
/SAPAPO/CDPSOPT605
Number of activities scheduled before preprocessing: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.