Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 602
Message text: Number of activities for optimization: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT602
- Number of activities for optimization: &1 ?The SAP error message
/SAPAPO/CDPSOPT602
indicates that the number of activities for optimization has exceeded the allowed limit. This error typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning modules.Cause:
The error is triggered when the optimization process encounters more activities than it can handle. This can happen due to:
- Excessive Activities: The planning run is trying to optimize too many activities at once, which can exceed system limits.
- Configuration Issues: The system may not be configured correctly to handle the volume of data being processed.
- Data Volume: A large number of planned orders, production orders, or other activities in the planning book can lead to this error.
- System Performance: Insufficient system resources (CPU, memory) can also contribute to this issue.
Solution:
To resolve this error, consider the following approaches:
Reduce the Number of Activities:
- Limit the scope of the planning run by filtering out unnecessary activities or focusing on a smaller time frame.
- Break down large planning runs into smaller, more manageable batches.
Check Configuration Settings:
- Review the configuration settings in the APO system to ensure they are optimized for your data volume.
- Adjust the settings related to the maximum number of activities allowed for optimization.
Optimize Data Volume:
- Archive or delete old or unnecessary data that may be contributing to the high number of activities.
- Ensure that only relevant data is included in the planning run.
System Performance:
- Monitor system performance and resource usage during the planning run. If necessary, consider upgrading hardware or optimizing system settings.
- Check for any background jobs or processes that may be consuming resources during the planning run.
Consult SAP Notes:
- Look for relevant SAP Notes or Knowledge Base Articles (KBAs) that may provide additional insights or patches related to this error.
Contact SAP Support:
- If the issue persists after trying the above solutions, consider reaching out to SAP Support for further assistance.
Related Information:
/SAPAPO/CDPSOPT
for optimization settings.By following these steps, you should be able to address the /SAPAPO/CDPSOPT602
error effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT601
Number of resources: &1, number of which selected: &2
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT525
Weighting for total costs
manually. INCLUDE STANDARDMODUSKOSTEN OBJECT DOKU ID TX the optimization profile. Modes with priority Z can only be scheduled You enter the mode cost...
/SAPAPO/CDPSOPT603
Number of selected activities: &1
What causes this issue? You have selected &V1& activities on the planning board, for optimization.System Response Only the selected activiti...
/SAPAPO/CDPSOPT604
Number of activities after preprocessing: &1
What causes this issue? After the preprocessing, &V1& activities can still be rescheduled for optimization (not <DS:TX.OPTIMIERUNG_FIXIERT...