Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 601
Message text: Number of resources: &1, number of which selected: &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT601
- Number of resources: &1, number of which selected: &2 ?The SAP error message /SAPAPO/CDPSOPT601 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning modules. This error message indicates a discrepancy between the total number of resources available and the number of resources that have been selected for a particular operation or planning run.
Cause: The error message /SAPAPO/CDPSOPT601 is triggered when: The number of resources defined in the system (e.g., work centers, machines) does not match the number of resources that have been selected for a specific planning operation. There may be a configuration issue where not all resources are being considered or selected during the planning process. There could be a mismatch in the resource selection criteria or filters applied in the planning run.
Solution: To resolve this error, you can take the following steps: Check Resource Configuration: Verify the configuration of the resources in the system. Ensure that all necessary resources are defined
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT525
Weighting for total costs
INCLUDE STANDARDMODUSKOSTEN OBJECT DOKU ID TX manually. the optimization profile. Modes with priority Z can only be scheduled You enter the mode cost...
/SAPAPO/CDPSOPT524
Minimizing the average delay
The average delay means the average of all delays of production orders in a planning period.System Response The system optimizes the preset planning...
/SAPAPO/CDPSOPT602
Number of activities for optimization: &1
What causes this issue? The optimizer considers &V1& activities. The following activities are fixed for the optimizer: &V2& activitie...
/SAPAPO/CDPSOPT603
Number of selected activities: &1
What causes this issue? You have selected &V1& activities on the planning board, for optimization.System Response Only the selected activiti...
Click on this link to search all SAP messages.