How To Fix /SAPAPO/CDPSOPT604 - Number of activities after preprocessing: &1


/SAPAPO/CDPSOPT604 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 604

  • Message text: Number of activities after preprocessing: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT604 - Number of activities after preprocessing: &1 ?
    The SAP error message /SAPAPO/CDPSOPT604 indicates that there is an issue with the number of activities after preprocessing in the SAP Advanced Planning and Optimization (APO) module, specifically in the context of the Capacity Planning or Production Planning processes. The message typically means that the number of activities that have been generated after the preprocessing step exceeds a certain threshold, which can lead to performance issues or processing failures.
    
    Cause: Excessive Activities: The primary cause of this error is that the number of activities generated during the planning run exceeds the system's configured limits. This can happen due to: A large number of planned orders or production orders. Complex planning scenarios with many constraints and dependencies. Inefficient planning parameters or settings that lead to excessive activity generation. Configuration Limits: The system may have predefined limits for the number of activities that can be processed in a single run. If these limits are exceeded, the error will

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker