Message type: E = Error
Message class: /SAPAPO/ATPLOG_PAL -
Message number: 115
Message text: The number of periods is larger than 999!
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATPLOG_PAL115
- The number of periods is larger than 999! ?The SAP error message /SAPAPO/ATPLOG_PAL115 indicates that the number of periods specified in a certain context (likely related to Advanced Planning and Optimization, or APO) exceeds the maximum limit of 999 periods. This error typically arises in scenarios involving planning, forecasting, or availability checks where a time horizon is defined.
Cause: Exceeding Period Limit: The primary cause of this error is that the configuration or input data specifies a time horizon that exceeds 999 periods. This could be due to: Incorrect settings in the planning parameters. User input that inadvertently specifies too many periods. A configuration issue in the planning book or data view.
Solution: To resolve this error, you can take the following steps: Check Planning Parameters: Review the planning parameters in the relevant planning book or data view. Ensure that the number of periods is set to a value less than or equal to 999. Adjust Time Horizon: If you are running a planning run or a forecast, adjust
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/ATPLOG_PAL114
Error during determination of period start and period end
What causes this issue? The start date and the end date could not be determined for period &v1& using type &v2& (variant &v3&...
/SAPAPO/ATPLOG_PAL113
Error during determination of period length
What causes this issue? No period &v2& (variant &v3&) could be determined for date &v1&. You have probably not defined the (y...
/SAPAPO/ATPLOG_PAL116
The interval was reduced
What causes this issue? The interval to be transferred was reduced, and now extends from &V2& to &v3& for the product allocation grou...
/SAPAPO/ATPLOG_PAL117
The delivery quantity is larger than the product allocation quantity
What causes this issue? For documents &v1&/&v2& (POSGUID &v3&) the delivery quantity is larger than the product allocation qu...
Click on this link to search all SAP messages.