Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATPLOG_PAL -
Message number: 114
Message text: Error during determination of period start and period end
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATPLOG_PAL114
- Error during determination of period start and period end ?The SAP error message
/SAPAPO/ATPLOG_PAL114
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the determination of the period start and period end dates during the ATP (Available to Promise) check or planning process. This error can arise due to various reasons, including configuration issues, data inconsistencies, or incorrect settings in the planning environment.Causes:
- Incorrect Planning Period Configuration: The planning periods may not be defined correctly in the system, leading to issues in determining the start and end dates.
- Missing Master Data: Required master data (like product master, location master, etc.) may be incomplete or missing.
- Calendar Settings: The calendar settings in the system may not align with the planning periods, causing discrepancies.
- Data Inconsistencies: There may be inconsistencies in the data that are being used for the ATP check or planning run.
- Version Issues: The version of the planning book or data view being used may not be compatible with the current settings.
Solutions:
Check Planning Period Configuration:
- Go to the configuration settings for planning periods in the APO system and ensure that they are set up correctly.
- Verify that the start and end dates for the planning periods are defined and do not overlap incorrectly.
Review Master Data:
- Ensure that all necessary master data is complete and correctly maintained. Check the product master, location master, and any other relevant data.
- Use transaction codes like
/SAPAPO/MAT1
to check product master data.Verify Calendar Settings:
- Check the calendar settings in the system to ensure they are correctly defined and aligned with the planning periods.
- Use transaction code
/SAPAPO/CALEND
to review and adjust calendar settings if necessary.Data Consistency Check:
- Run consistency checks on the data being used for the ATP check or planning run. This can help identify any discrepancies or missing data.
- Use transaction codes like
/SAPAPO/ATPC
to perform ATP checks and identify issues.Check Version Compatibility:
- Ensure that the version of the planning book or data view being used is compatible with the current settings and data.
- If necessary, create a new version or adjust the existing one to align with the current configuration.
Consult SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates that resolve known issues.
Related Information:
/SAPAPO/ATPC
, /SAPAPO/MAT1
, and /SAPAPO/CALEND
for troubleshooting.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATPLOG_PAL113
Error during determination of period length
What causes this issue? No period &v2& (variant &v3&) could be determined for date &v1&. You have probably not defined the (y...
/SAPAPO/ATPLOG_PAL112
Time series of planning area &1 are locked
What causes this issue? A lock error occurred when you tried to change the time series of a planning area. You cannot carry out the changes at the cu...
/SAPAPO/ATPLOG_PAL115
The number of periods is larger than 999!
What causes this issue? The number of periods lies between &V2& and &V3& &V4& for the product allocation group &V1&. ...
/SAPAPO/ATPLOG_PAL116
The interval was reduced
What causes this issue? The interval to be transferred was reduced, and now extends from &V2& to &v3& for the product allocation grou...
Click on this link to search all SAP messages.