Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATPLOG_PAL -
Message number: 113
Message text: Error during determination of period length
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATPLOG_PAL113
- Error during determination of period length ?The SAP error message
/SAPAPO/ATPLOG_PAL113
indicates that there is an issue during the determination of the period length in the Advanced Planning and Optimization (APO) module, specifically in the Available-to-Promise (ATP) functionality. This error can arise due to various reasons, including configuration issues, data inconsistencies, or missing master data.Causes:
- Configuration Issues: The period length settings in the APO system may not be correctly configured. This can include settings related to the planning calendar or the time bucket settings.
- Master Data Issues: Missing or incorrect master data, such as product master data, location data, or planning book settings, can lead to this error.
- Data Inconsistencies: Inconsistencies in the data being processed, such as overlapping periods or incorrect time intervals, can trigger this error.
- Versioning Issues: If there are multiple versions of planning data, the system may have trouble determining which version to use for the period length calculation.
Solutions:
- Check Configuration: Review the configuration settings for the planning calendar and time buckets in the APO system. Ensure that they are set up correctly and align with your business requirements.
- Validate Master Data: Ensure that all relevant master data is complete and accurate. Check the product master, location master, and any other relevant data that may impact ATP calculations.
- Review Planning Books: Check the planning books and their settings to ensure that they are correctly configured for the products and locations involved.
- Data Consistency Check: Run consistency checks on the data to identify any discrepancies or issues that may be causing the error. This can include checking for overlapping periods or incorrect time intervals.
- Check for Updates: Ensure that your SAP system is up to date with the latest patches and updates, as some errors may be resolved in newer versions.
- Consult SAP Notes: Look for relevant SAP Notes that may address this specific error. SAP frequently releases notes that provide solutions or workarounds for known issues.
Related Information:
/SAPAPO/ATPL
to access ATP-related settings and configurations.If the problem persists after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATPLOG_PAL112
Time series of planning area &1 are locked
What causes this issue? A lock error occurred when you tried to change the time series of a planning area. You cannot carry out the changes at the cu...
/SAPAPO/ATPLOG_PAL111
User exit &2 in &1 is active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATPLOG_PAL114
Error during determination of period start and period end
What causes this issue? The start date and the end date could not be determined for period &v1& using type &v2& (variant &v3&...
/SAPAPO/ATPLOG_PAL115
The number of periods is larger than 999!
What causes this issue? The number of periods lies between &V2& and &V3& &V4& for the product allocation group &V1&. ...
Click on this link to search all SAP messages.