Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 098
Message text: &1: Date change is before request schedule line
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP098
- &1: Date change is before request schedule line ?The SAP error message
/SAPAPO/ATP_BOP098 &1: Date change is before request schedule line
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an attempt to change a date that is earlier than the scheduled line date of a request. This can happen during various processes, such as order processing, planning, or when adjusting delivery dates.Cause:
- Date Change Attempt: The user is trying to change a date (e.g., delivery date, production date) to a value that is earlier than the existing schedule line date.
- Business Rules: The system enforces business rules that prevent scheduling or planning actions that would lead to inconsistencies in the supply chain.
- Configuration Issues: There may be configuration settings in the APO system that restrict date changes based on certain criteria.
Solution:
- Check the Schedule Line Date: Review the current schedule line date for the request. Ensure that any date changes you are attempting to make are later than this date.
- Adjust the Date: If you need to change the date, ensure that the new date is on or after the schedule line date.
- Review Business Processes: Ensure that the business processes and rules allow for the intended date changes. If necessary, consult with your business process owner or SAP consultant to understand the implications of changing dates.
- Configuration Review: If the issue persists, review the configuration settings in the APO system to ensure they align with your business requirements. This may involve checking settings related to ATP (Available to Promise) and scheduling.
- Consult Documentation: Refer to SAP documentation or help resources for more detailed information on the error and potential solutions.
Related Information:
/SAPAPO/ATPL
for ATP checks or /SAPAPO/SDP94
for planning board adjustments.If the problem continues after following these steps, it may be beneficial to engage with SAP support or a qualified SAP consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP_BOP097
&1: You have deliberately generated an overconfirmation
What causes this issue? You have generated an overconfirmation, that is, the sum of the confirmed quantities for a product in a location is greater t...
/SAPAPO/ATP_BOP096
&1: Changing confirmation to &2 leads to a shortage of &3.
What causes this issue? You are about to generate an overconfirmation, i.e. the total quantity currently confirmed will then be greater than the sum ...
/SAPAPO/ATP_BOP099
&1: Confirmation (&2) can only be made for the amount of the ATP qty (&3)
What causes this issue? The total quantity currently confirmed is greater than the sum of the cumulated ATP quantity on the due date and the original...
/SAPAPO/ATP_BOP100
&1: Total confirmed quantity (&2) is greater than requirement qty (&3)
What causes this issue? You have tried to increase the confirmed quantity so that the total confirmed quantity of the item exceeds the requirement qu...
Click on this link to search all SAP messages.