Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 097
Message text: &1: You have deliberately generated an overconfirmation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP097
- &1: You have deliberately generated an overconfirmation ?The SAP error message
/SAPAPO/ATP_BOP097
indicates that there has been an overconfirmation in the Available-to-Promise (ATP) process within the Advanced Planning and Optimization (APO) module. This typically occurs when the system has confirmed more quantities than are actually available, which can lead to issues in supply chain management and order fulfillment.Cause:
Overconfirmation: The primary cause of this error is that the system has been configured to allow confirmations that exceed the available stock or capacity. This can happen due to:
- Incorrect settings in the ATP check configuration.
- Manual adjustments or overrides that lead to overconfirmation.
- Changes in demand or supply that were not updated in the system.
Planning Parameters: The planning parameters may not be set correctly, leading to discrepancies between the confirmed quantities and actual available quantities.
Master Data Issues: Problems with master data, such as incorrect stock levels, lead times, or safety stock settings, can also contribute to this error.
Solution:
Review ATP Configuration: Check the configuration settings for ATP checks in the system. Ensure that the settings are aligned with your business processes and that they prevent overconfirmation.
Adjust Confirmations: If overconfirmation has occurred, you may need to manually adjust the confirmed quantities to reflect the actual available stock. This can involve:
- Reducing the confirmed quantities in the sales order or production order.
- Re-evaluating the demand and supply situation to ensure accurate confirmations.
Update Master Data: Ensure that all relevant master data (material master, BOM, routing, etc.) is accurate and up-to-date. This includes checking stock levels, lead times, and safety stock settings.
Monitor and Analyze: Implement monitoring tools to analyze ATP confirmations and identify patterns that lead to overconfirmation. This can help in adjusting processes and configurations proactively.
Training and Awareness: Ensure that users involved in order processing and ATP checks are trained on the implications of overconfirmation and the importance of accurate data entry.
Related Information:
By addressing the root causes and implementing the suggested solutions, you can mitigate the occurrence of the /SAPAPO/ATP_BOP097
error and improve the accuracy of your ATP processes.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP_BOP096
&1: Changing confirmation to &2 leads to a shortage of &3.
What causes this issue? You are about to generate an overconfirmation, i.e. the total quantity currently confirmed will then be greater than the sum ...
/SAPAPO/ATP_BOP095
Partial confirmation with date proposal
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP098
&1: Date change is before request schedule line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP099
&1: Confirmation (&2) can only be made for the amount of the ATP qty (&3)
What causes this issue? The total quantity currently confirmed is greater than the sum of the cumulated ATP quantity on the due date and the original...
Click on this link to search all SAP messages.