Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 100
Message text: &1: Total confirmed quantity (&2) is greater than requirement qty (&3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP100
- &1: Total confirmed quantity (&2) is greater than requirement qty (&3) ?The SAP error message
/SAPAPO/ATP_BOP100
indicates that there is a discrepancy between the total confirmed quantity and the requirement quantity in the Advanced Planning and Optimization (APO) module, specifically in the Available-to-Promise (ATP) check. The message format is as follows:
This error typically occurs when the total quantity that has been confirmed for a particular item exceeds the quantity that is actually required. This can happen due to several reasons:
To resolve this error, you can take the following steps:
Review Confirmed Quantities: Check the confirmed quantities for the item in question. You can do this by navigating to the relevant transaction in SAP APO and reviewing the order confirmations.
Check Requirement Planning: Verify the requirement quantities in the planning run. Ensure that the requirements are correctly defined and updated in the system.
Adjust Confirmations: If you find that the confirmed quantity is indeed greater than the requirement, you may need to adjust the confirmations. This could involve reducing the confirmed quantities or modifying the orders.
Analyze Order History: Look into the order history to identify any discrepancies or issues that may have led to the over-confirmation.
Consult with Planning Team: If necessary, consult with your planning team to ensure that the planning parameters and settings are correctly configured.
Run ATP Check Again: After making the necessary adjustments, run the ATP check again to see if the issue has been resolved.
/SAPAPO/ATP
to check ATP results or /SAPAPO/SDP94
for detailed planning results.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP_BOP099
&1: Confirmation (&2) can only be made for the amount of the ATP qty (&3)
What causes this issue? The total quantity currently confirmed is greater than the sum of the cumulated ATP quantity on the due date and the original...
/SAPAPO/ATP_BOP098
&1: Date change is before request schedule line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP101
Enter a product
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP102
Enter a location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.