Do you have any question about this error?
Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 105
Message text: Error calculating the planning horizon
An error occurred when calculating the absolute
<DS:DE.S2L_PLNG_HORIZON>planning horizon</>. (See following message in
log.)
As the system cannot determine the planning horizon, it uses a
consumption-based logic for this
<DS:GLOS.775D5AEF70E8D411BCBA0800060D9C68>supply segment</>.
Check the control cycle and the scheduling profile.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
S2L105
- Error calculating the planning horizon ?The SAP error message S2L105, which states "Error calculating the planning horizon," typically occurs in the context of planning and forecasting processes within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that there is an issue with the configuration or data that is preventing the system from calculating the planning horizon correctly.
Causes:
Configuration Issues: Incorrect settings in the planning area or planning version can lead to this error. This includes issues with the time profile, planning horizon settings, or other related configurations.
Data Issues: Missing or incorrect data in the master data or transaction data can cause the planning horizon calculation to fail. This could include missing time periods, invalid dates, or incorrect key figures.
Time Periods: The planning horizon may be set to a time period that does not align with the available data or the defined time buckets.
System Performance: In some cases, performance issues or system resource limitations can lead to errors during complex calculations.
Solutions:
Check Configuration: Review the configuration settings for the planning area, including the time profile and planning horizon settings. Ensure that they are correctly defined and aligned with your business requirements.
Validate Data: Check the master data and transaction data for completeness and accuracy. Ensure that all necessary data is available for the planning horizon calculation.
Adjust Time Periods: If the planning horizon is set to a specific time period, ensure that this period is valid and that there are no gaps in the data for that period.
Review Logs: Check the application logs or error logs for more detailed information about the error. This can provide insights into what specifically is causing the calculation to fail.
System Performance: If performance is an issue, consider optimizing the system or increasing resources to handle the calculations more effectively.
Consult Documentation: Refer to SAP documentation or support notes related to the specific module you are using for any known issues or additional troubleshooting steps.
Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may have additional insights or patches available for your specific version of the software.
Related Information:
By systematically addressing these areas, you should be able to resolve the S2L105 error and successfully calculate the planning horizon in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
S2L104
Supply segment is excluded from planning
What causes this issue? The control cycle for material &V1&, plant &V2& and production supply area &V3& uses the same stock.S...
S2L103
Control cycle &2 is locked by user &1
What causes this issue? Control cycle &v2& (material &v3&, supply area &v4&) is locked by user &v1& . The system issu...
S2L106
Error calculating the selection horizon
What causes this issue? An error occurred when calculating the selection horizon. (See message in log.)System Response The selection horizon is calc...
S2L107
Error calculating the earliest replenishment lead time
What causes this issue? An error occurred in the calculation of the earliest replenishment lead time. (See message in log).System Response The reple...
Click on this link to search all SAP messages.