Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 106
Message text: Error calculating the selection horizon
An error occurred when calculating the selection horizon. (See message
in log.)
The selection horizon is calculated internally from the
<DS:DE.S2L_PLNG_HORIZON>planning horizon</> and determines the time
until which dependent requirements are read and analyzed.
As an error occurred during the calculation, the system only analyzes
the requirements in the planning horizon. Backflushes carried out ahead
of schedule for orders planned in the future may not be recognized.
Check the control cycle and the scheudling profile.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
S2L106
- Error calculating the selection horizon ?The SAP error message S2L106, which states "Error calculating the selection horizon," typically occurs in the context of SAP's logistics and planning modules, particularly when dealing with planning scenarios such as Material Requirements Planning (MRP) or Production Planning (PP). This error indicates that there is an issue with the system's ability to determine the selection horizon for planning purposes. Causes:
Configuration Issues: Incorrect settings in the planning parameters or master data can lead to this error. This includes settings related to the planning horizon, such as start and end dates. Master Data Problems: Missing or incorrect master data for materials, such as MRP views, lead times, or planning strategies, can cause the system to fail in calculating the selection horizon. Data Consistency: Inconsistencies in the data, such as invalid dates or periods, can lead to errors in calculations. System Performance: If the system is under heavy load or if there are performance issues, it may
Get instant SAP help. Sign up for our Free Essentials Plan.
S2L105
Error calculating the planning horizon
What causes this issue? An error occurred when calculating the absolute <DS:DE.S2L_PLNG_HORIZON>planning horizon</>. (See following messa...
S2L104
Supply segment is excluded from planning
What causes this issue? The control cycle for material &V1&, plant &V2& and production supply area &V3& uses the same stock.S...
S2L107
Error calculating the earliest replenishment lead time
What causes this issue? An error occurred in the calculation of the earliest replenishment lead time. (See message in log).System Response The reple...
S2L108
No authorization for creating replenishment elements
What causes this issue? You do not have the necessary authorization to create replenishment elements in plant &V1&.System Response The <D...