Do you have any question about this error?
Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 107
Message text: Error calculating the earliest replenishment lead time
An error occurred in the calculation of the earliest replenishment lead
time. (See message in log).
The replenishment lead time cannot be taken into account. The current
time is used as the earlies replenishment lead time (which does not
usually produce realistic results).
Check the control cycle and the scheudling profile.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
S2L107
- Error calculating the earliest replenishment lead time ?The SAP error message S2L107, which states "Error calculating the earliest replenishment lead time," typically occurs in the context of inventory management and supply chain processes. This error can arise due to various reasons related to the configuration of materials, planning parameters, or master data.
Causes:
- Missing or Incorrect Master Data: The material master data may be incomplete or incorrectly configured. This includes missing lead times, safety stock levels, or other relevant parameters.
- Planning Parameters: The planning parameters for the material may not be set correctly. This includes settings related to replenishment lead times, safety stock, and reorder points.
- Inconsistent Data: There may be inconsistencies in the data related to the material, such as different lead times defined in different views (e.g., MRP view vs. purchasing view).
- System Configuration Issues: There may be issues with the configuration of the MRP (Material Requirements Planning) settings in the system.
- Time Periods: The system may be trying to calculate lead times for a time period that is not valid or does not have relevant data.
Solutions:
- Check Master Data: Review the material master data for the affected material. Ensure that all relevant fields, especially those related to lead times, are filled out correctly.
- Review Planning Parameters: Check the planning parameters in the MRP view of the material master. Ensure that the lead times are set correctly and that there are no discrepancies.
- Consistency Check: Perform a consistency check on the material data to identify any inconsistencies or missing information.
- Configuration Review: Review the MRP configuration settings in the system. Ensure that the settings align with the business requirements and that there are no misconfigurations.
- Check Time Periods: Ensure that the time periods for which the system is trying to calculate lead times are valid and that there is relevant data available for those periods.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the S2L107 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
S2L106
Error calculating the selection horizon
What causes this issue? An error occurred when calculating the selection horizon. (See message in log.)System Response The selection horizon is calc...
S2L105
Error calculating the planning horizon
What causes this issue? An error occurred when calculating the absolute <DS:DE.S2L_PLNG_HORIZON>planning horizon</>. (See following messa...
S2L108
No authorization for creating replenishment elements
What causes this issue? You do not have the necessary authorization to create replenishment elements in plant &V1&.System Response The <D...
S2L110
The control cycle was entered in the lock list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.