Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 107
Message text: Error calculating the earliest replenishment lead time
An error occurred in the calculation of the earliest replenishment lead
time. (See message in log).
The replenishment lead time cannot be taken into account. The current
time is used as the earlies replenishment lead time (which does not
usually produce realistic results).
Check the control cycle and the scheudling profile.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
S2L107
- Error calculating the earliest replenishment lead time ?The SAP error message S2L107, which states "Error calculating the earliest replenishment lead time," typically occurs in the context of inventory management and supply chain processes. This error can arise due to various reasons related to the configuration of materials, planning parameters, or master data. Causes: Missing or Incorrect Master Data: The material master data may be incomplete or incorrectly configured. This includes missing lead times, safety stock levels, or other relevant parameters. Planning Parameters: The planning parameters for the material may not be set correctly. This includes settings related to replenishment lead times, safety stock, and reorder points. Inconsistent Data: There may be inconsistencies in the data related to the material, such as different lead times defined in different views (e.g., MRP view vs. purchasing view). System
Configuration Issues: There may be issues with the configuration of the MRP (Material Requirements Planning) settings in the system. Time Periods: The system may be trying to calculate
Get instant SAP help. Sign up for our Free Essentials Plan.
S2L106
Error calculating the selection horizon
What causes this issue? An error occurred when calculating the selection horizon. (See message in log.)System Response The selection horizon is calc...
S2L105
Error calculating the planning horizon
What causes this issue? An error occurred when calculating the absolute <DS:DE.S2L_PLNG_HORIZON>planning horizon</>. (See following messa...
S2L108
No authorization for creating replenishment elements
What causes this issue? You do not have the necessary authorization to create replenishment elements in plant &V1&.System Response The <D...
S2L110
The control cycle was entered in the lock list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.