Message type: E = Error
Message class: S2L - Production Supply: General Messages
Message number: 103
Message text: Control cycle &2 is locked by user &1
Control cycle &v2& (material &v3&, supply area &v4&) is locked by user
&v1& .
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
S2L103
- Control cycle &2 is locked by user &1 ?The SAP error message S2L103 indicates that a control cycle is locked by a specific user. This typically occurs in the context of production planning and control, where control cycles are used to manage the flow of materials and production processes.
Cause: The error message is triggered when a user attempts to access or modify a control cycle that is currently locked by another user. This locking mechanism is in place to prevent concurrent modifications that could lead to data inconsistencies.
Solution: To resolve this issue, you can take the following steps: Identify the Locking User: Check which user is currently locking the control cycle. The error message provides the user ID (&1) that is holding the lock. Contact the User: If possible, reach out to the user who is locking the control cycle to understand why they are accessing it. They may be in the process of making changes or may have forgotten to release
Get instant SAP help. Sign up for our Free Essentials Plan.
S2L102
Automatic supply is not supported for single orders
What causes this issue? The supply segment refers to special stock (control cycle &v1&, material &v2&, <DS:DE.SOBKZ>Special sto...
S2L101
Control cycle &1 is not intended for automatic supply
What causes this issue? Automatic production supply is not intended for control cycle &v1& (material &v2&, plant &v3&, supply...
S2L104
Supply segment is excluded from planning
What causes this issue? The control cycle for material &V1&, plant &V2& and production supply area &V3& uses the same stock.S...
S2L105
Error calculating the planning horizon
What causes this issue? An error occurred when calculating the absolute <DS:DE.S2L_PLNG_HORIZON>planning horizon</>. (See following messa...
Click on this link to search all SAP messages.