Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 290
Message text: All capacity reqmts for planned order will be deleted, as routing deleted
The system deletes all capacity requirements for the planned order to
be reduced as the corresponding routing has been deleted since the
planned order was created.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM290
- All capacity reqmts for planned order will be deleted, as routing deleted ?The SAP error message RM290 indicates that all capacity requirements for a planned order will be deleted because the routing associated with that planned order has been deleted. This typically occurs in the context of production planning and scheduling within SAP's ERP system.
Cause:
- Deleted Routing: The primary cause of this error is that the routing (the sequence of operations required to produce a product) linked to the planned order has been deleted. When a routing is deleted, any planned orders that reference that routing can no longer have their capacity requirements calculated, leading to this error message.
- Changes in Master Data: Changes in the master data, such as the deletion of a work center or changes in the production version, can also lead to this error.
- Inconsistent Data: If there are inconsistencies in the data related to the planned order, such as missing or incorrect references to the routing, this error may occur.
Solution:
- Restore the Routing: If the routing was deleted by mistake, restoring it can resolve the issue. You can do this by recreating the routing in the system.
- Check Planned Order: Review the planned order to ensure that it is still valid. If the routing is no longer needed, you may need to create a new routing or adjust the planned order to reference an existing routing.
- Adjust Master Data: Ensure that all relevant master data (like work centers, materials, and production versions) is correctly set up and consistent.
- Recreate Planned Order: If the routing cannot be restored, you may need to delete the planned order and create a new one that references a valid routing.
- Consult Documentation: Check SAP documentation or consult with your SAP support team for specific steps related to your version of SAP and your organization's configuration.
Related Information:
CO02
(Change Production Order) or MD04
(Stock/Requirements List) to investigate the planned order and its associated routing.By following these steps, you should be able to resolve the RM290 error and ensure that your planned orders are correctly linked to valid routings.
Get instant SAP help. Start your 7-day free trial now.
RM282
Reporting point confirmation in past not possible
What causes this issue? You are trying to carry out a reporting point backflush for a date in the past. Since changes have already been made to the m...
RM281
Control key of the reporting point operation has changed
What causes this issue? The control key assigned to the reporting point operation (milestone operation) has not been defined for milestone processing...
RM299
Reporting point changed, but still decoupled confirmation to be posted
What causes this issue? For a production version, the reporting point structure should be created again (with or without preliminary costing of the p...
RM300
Error creating line items for reporting points (PZPE)
What causes this issue? This error should not occur.System Response The system issues an error message and will not allow you to continue with this ...
Click on this link to search all SAP messages.