Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 282
Message text: Reporting point confirmation in past not possible
You are trying to carry out a reporting point backflush for a date in
the past.
Since changes have already been made to the milestones in the
corresponding routing, a version-specific calculation (preliminary
costing) must be carried out, in order to update the reporting point
structure. It is not possible to do this using a date in the past.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Because the routing has been changed, nothing can be posted for a date
in the past (exception: posting in the previous period). Change the
posting date correspondingly.
Error message extract from SAP system. Copyright SAP SE.
RM282
- Reporting point confirmation in past not possible ?The SAP error message RM282, which states "Reporting point confirmation in past not possible," typically occurs when you attempt to confirm a reporting point (such as a production order or a process order) with a date that is earlier than the current date or the date that is set in the system for that reporting point.
Cause: Date Restrictions: The system has date restrictions in place that prevent confirmations from being made for dates in the past. This is often a configuration setting to ensure data integrity and accuracy in reporting. Order Status: The order may be in a status that does not allow for past confirmations. For example, if the order is already completed or closed, past confirmations may not be allowed. System Settings: The system may have been configured to disallow past confirmations for specific types of orders or processes.
Solution: Check the Date: Ensure that the date you are trying to use for
Get instant SAP help. Sign up for our Free Essentials Plan.
RM281
Control key of the reporting point operation has changed
What causes this issue? The control key assigned to the reporting point operation (milestone operation) has not been defined for milestone processing...
RM273
Immediate backflush in update task is not possible
What causes this issue? Integration between EWM and Manufacturing is active and the receiving storage location is EWM-managed. You want to immediatel...
RM290
All capacity reqmts for planned order will be deleted, as routing deleted
What causes this issue? The system deletes all capacity requirements for the planned order to be reduced as the corresponding routing has been delete...
RM299
Reporting point changed, but still decoupled confirmation to be posted
What causes this issue? For a production version, the reporting point structure should be created again (with or without preliminary costing of the p...
Click on this link to search all SAP messages.