Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 281
Message text: Control key of the reporting point operation has changed
The control key assigned to the reporting point operation (milestone
operation) has not been defined for milestone processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please assign the reporting point operation (milestone
operation) with a control key that is allowed for milestone processing.
Error message extract from SAP system. Copyright SAP SE.
RM281
- Control key of the reporting point operation has changed ?The SAP error message RM281, which states "Control key of the reporting point operation has changed," typically occurs in the context of production planning and execution, particularly when dealing with reporting point operations in the Production Order (PP) module. This error indicates that there is a mismatch or inconsistency in the control key associated with a reporting point operation.
Cause:
- Control Key Change: The control key for a reporting point operation has been modified after the operation was created. This can happen if the operation was edited or if the control key was changed in the master data (e.g., in the routing or work center).
- Inconsistent Data: There may be inconsistencies in the data between the operation and the control key settings, leading to the error when trying to perform certain actions (like confirmations).
- User Actions: Users may have inadvertently changed the control key while trying to update the operation or during the confirmation process.
Solution:
- Check Control Key Settings: Review the control key settings in the routing or work center to ensure they are correct and consistent with the operation you are trying to process.
- Revert Changes: If the control key was changed unintentionally, revert it back to the original value that was used when the operation was created.
- Update Operations: If the control key needs to be changed for a valid reason, ensure that all related operations are updated accordingly to reflect this change.
- Confirm Operations: If you are trying to confirm an operation, ensure that the control key matches the one defined in the routing for that operation.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling control key changes and reporting point operations.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the PP module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RM273
Immediate backflush in update task is not possible
What causes this issue? Integration between EWM and Manufacturing is active and the receiving storage location is EWM-managed. You want to immediatel...
RM271
Error determining consignment vendor
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM282
Reporting point confirmation in past not possible
What causes this issue? You are trying to carry out a reporting point backflush for a date in the past. Since changes have already been made to the m...
RM290
All capacity reqmts for planned order will be deleted, as routing deleted
What causes this issue? The system deletes all capacity requirements for the planned order to be reduced as the corresponding routing has been delete...
Click on this link to search all SAP messages.