Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 281
Message text: Control key of the reporting point operation has changed
The control key assigned to the reporting point operation (milestone
operation) has not been defined for milestone processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please assign the reporting point operation (milestone
operation) with a control key that is allowed for milestone processing.
Error message extract from SAP system. Copyright SAP SE.
RM281
- Control key of the reporting point operation has changed ?The SAP error message RM281, which states "Control key of the reporting point operation has changed," typically occurs in the context of production planning and execution, particularly when dealing with reporting point operations in the Production Order (PP) module. This error indicates that there is a mismatch or inconsistency in the control key associated with a reporting point operation.
Cause: Control Key Change: The control key for a reporting point operation has been modified after the operation was created. This can happen if the operation was edited or if the control key was changed in the master data (e.g., in the routing or work center). Inconsistent Data: There may be inconsistencies in the data between the operation and the control key settings, leading to the error when trying to perform certain actions (like confirmations). User Actions: Users may have inadvertently changed the control key while trying to update the operation or during the confirmation
Get instant SAP help. Sign up for our Free Essentials Plan.
RM273
Immediate backflush in update task is not possible
What causes this issue? Integration between EWM and Manufacturing is active and the receiving storage location is EWM-managed. You want to immediatel...
RM271
Error determining consignment vendor
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM282
Reporting point confirmation in past not possible
What causes this issue? You are trying to carry out a reporting point backflush for a date in the past. Since changes have already been made to the m...
RM290
All capacity reqmts for planned order will be deleted, as routing deleted
What causes this issue? The system deletes all capacity requirements for the planned order to be reduced as the corresponding routing has been delete...
Click on this link to search all SAP messages.