Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 299
Message text: Reporting point changed, but still decoupled confirmation to be posted
For a production version, the reporting point structure should be
created again (with or without preliminary costing of the product cost
collector), because reporting points have been added or deleted. On the
same day already, backflushes were created to which separate goods
issues or production activities must be posted.
The recording point structure cannot be updated, as the separate goods
issues or production activities would then not be made up for. If you
are using preliminary costing, this is therefore terminated.
First complete the postings that are still open (Logistics ->
Production -> Repetitive Manufacturing -> Backflush -> Separated
Backflush)
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM299
- Reporting point changed, but still decoupled confirmation to be posted ?The SAP error message RM299, which states "Reporting point changed, but still decoupled confirmation to be posted," typically occurs in the context of production order processing, particularly when dealing with confirmations in the Production Planning (PP) module. This error indicates that there is a discrepancy between the reporting point of a production order and the confirmations that have been posted.
Cause: Reporting Point Change: The reporting point for a production order has been changed after some confirmations have already been posted. This can happen if the production process is modified, or if there are changes in the production order settings. Decoupled Confirmations: The system detects that there are confirmations that have been posted which are not aligned with the new reporting point. This can occur if the confirmations were made before the reporting point was changed, leading to inconsistencies.
Solution: To resolve this error, you can follow these steps: Check the Production Order: Review the production
Get instant SAP help. Sign up for our Free Essentials Plan.
RM290
All capacity reqmts for planned order will be deleted, as routing deleted
What causes this issue? The system deletes all capacity requirements for the planned order to be reduced as the corresponding routing has been delete...
RM282
Reporting point confirmation in past not possible
What causes this issue? You are trying to carry out a reporting point backflush for a date in the past. Since changes have already been made to the m...
RM300
Error creating line items for reporting points (PZPE)
What causes this issue? This error should not occur.System Response The system issues an error message and will not allow you to continue with this ...
RM301
Error changing line items for reporting points (PZPE)
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. What causes this issue? Thi...
Click on this link to search all SAP messages.