Do you have any question about this error?
Message type: E = Error
Message class: R11 - Business Partner and BDT
Message number: 359
Message text: Scheduling no longer possible using the field VALDT
You have attempted to plan data that is valid in the future, using the
field VALDT.
From Release 6.40, the planned changes technology is no longer
available. The transaction is terminated in this case.
The application-specific fields for the central data in the header
structure BUS0DIINIT, should be used in future for planning changes
Error message extract from SAP system. Copyright SAP SE.
R11359
- Scheduling no longer possible using the field VALDT ?The SAP error message R11359, which states "Scheduling no longer possible using the field VALDT," typically occurs in the context of scheduling operations in SAP, particularly when dealing with materials or production orders. This error indicates that the system cannot perform scheduling due to issues related to the validity date (VALDT) field.
Cause:
- Invalid Validity Date: The VALDT field may contain a date that is either in the past or not within the acceptable range for scheduling.
- Material Master Data Issues: The material master data may not be correctly maintained, leading to inconsistencies in the scheduling parameters.
- Production Order Status: The status of the production order may not allow for scheduling, possibly due to it being in a closed or completed state.
- Configuration Issues: There may be configuration settings in the system that restrict scheduling based on the VALDT field.
Solution:
- Check Validity Date: Verify the VALDT field in the relevant document (e.g., production order, purchase order) to ensure it is set to a valid date that is within the scheduling range.
- Review Material Master Data: Ensure that the material master data is correctly maintained, including the validity dates and any related scheduling parameters.
- Check Order Status: Review the status of the production order or relevant document to ensure it is in a state that allows for scheduling. If necessary, change the status to allow scheduling.
- Configuration Review: Consult with your SAP configuration team to review any settings that may affect scheduling based on the VALDT field. Adjust configurations if necessary.
- Use Alternative Scheduling Methods: If the issue persists, consider using alternative scheduling methods or tools within SAP that do not rely on the VALDT field.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
R11358
Validity change for currently displayed period not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
R11357
Deletion of currently displayed validity period not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
R11360
No central data for partner &1 in the required database activity &2
What causes this issue? During data exchange data is received that contains business partners without central data.System Response For the activitie...
R11400
*** BDT ***
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.