How To Fix R11359 - Scheduling no longer possible using the field VALDT


SAP Error Message - Details

  • Message type: E = Error

  • Message class: R11 - Business Partner and BDT

  • Message number: 359

  • Message text: Scheduling no longer possible using the field VALDT

  • Show details Hide details
  • What causes this issue?

    You have attempted to plan data that is valid in the future, using the
    field VALDT.

    System Response

    From Release 6.40, the planned changes technology is no longer
    available. The transaction is terminated in this case.

    How to fix this error?

    The application-specific fields for the central data in the header
    structure BUS0DIINIT, should be used in future for planning changes

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message R11359 - Scheduling no longer possible using the field VALDT ?

    The SAP error message R11359, which states "Scheduling no longer possible using the field VALDT," typically occurs in the context of scheduling operations in SAP, particularly when dealing with materials or production orders. This error indicates that the system cannot perform scheduling due to issues related to the validity date (VALDT) field.

    Cause:

    1. Invalid Validity Date: The VALDT field may contain a date that is either in the past or not within the acceptable range for scheduling.
    2. Material Master Data Issues: The material master data may not be correctly maintained, leading to inconsistencies in the scheduling parameters.
    3. Production Order Status: The status of the production order may not allow for scheduling, possibly due to it being in a closed or completed state.
    4. Configuration Issues: There may be configuration settings in the system that restrict scheduling based on the VALDT field.

    Solution:

    1. Check Validity Date: Verify the VALDT field in the relevant document (e.g., production order, purchase order) to ensure it is set to a valid date that is within the scheduling range.
    2. Review Material Master Data: Ensure that the material master data is correctly maintained, including the validity dates and any related scheduling parameters.
    3. Check Order Status: Review the status of the production order or relevant document to ensure it is in a state that allows for scheduling. If necessary, change the status to allow scheduling.
    4. Configuration Review: Consult with your SAP configuration team to review any settings that may affect scheduling based on the VALDT field. Adjust configurations if necessary.
    5. Use Alternative Scheduling Methods: If the issue persists, consider using alternative scheduling methods or tools within SAP that do not rely on the VALDT field.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), or MD04 (Stock/Requirements List) to investigate the issue further.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Review SAP documentation related to scheduling and production order management for best practices and guidelines.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker