Message type: E = Error
Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ
Message number: 008
Message text: See error log
An error has occurred.
INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TX
View the error log for more information. You access the error log by
choosing <LS>Extras -> Error log</>.
Error message extract from SAP system. Copyright SAP SE.
PSZ1008
- See error log ?The SAP error message PSZ1008, which prompts users to "See error log," typically indicates that there is an issue related to the Project System (PS) module in SAP. This error can arise from various causes, and the specific details can vary based on the context in which the error occurs. Here are some common causes, potential solutions, and related information:
Common Causes:
- Data Inconsistencies: There may be inconsistencies in the project data, such as missing or incorrect entries in the project structure or related master data.
- Authorization Issues: The user may not have the necessary authorizations to perform the action that triggered the error.
- Configuration Errors: Incorrect configuration settings in the Project System module can lead to errors during processing.
- Missing Dependencies: Required dependencies or objects (like WBS elements, networks, or activities) may be missing or not properly linked.
- Technical Issues: There could be underlying technical issues, such as problems with the database or application server.
Solutions:
- Check the Error Log: The first step is to check the error log for more detailed information about the error. This can usually be done by navigating to the relevant transaction (e.g., transaction code SLG1 for application logs) and filtering for the specific error message.
- Review Project Data: Ensure that all necessary project data is complete and accurate. Check for missing WBS elements, activities, or other related data.
- Verify Authorizations: Ensure that the user has the appropriate authorizations to perform the action. This may involve checking roles and permissions in the user profile.
- Configuration Review: Review the configuration settings in the Project System to ensure they are set up correctly. This may involve consulting with a functional consultant or SAP Basis team.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.
- Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and address the PSZ1008 error effectively.
Get instant SAP help. Start your 7-day free trial now.
PSZ1007
WBS element &1 is not assigned to an FM area
What causes this issue? WBS element &V1& is assigned to company code &V2&. This company code is not assgined to an FM area.System Res...
PSZ1006
WBS element &2 is not assigned to FM area &1
What causes this issue? WBS element &V2& is not assigned to company code &V3&. The company code is not assigned to FM area &V1&am...
PSZ1009
Status forbids payment planning for WBS element &1
What causes this issue? The current status of WBS element &V1& prohibits transaction <ZK>FIPL Payment Planning</>.System Response...
PSZ1010
Lock on objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.