How To Fix PSZ1007 - WBS element &1 is not assigned to an FM area


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ

  • Message number: 007

  • Message text: WBS element &1 is not assigned to an FM area

  • Show details Hide details
  • What causes this issue?

    WBS element &V1& is assigned to company code &V2&. This company code is
    not assgined to an FM area.

    System Response

    WBS element &V1& cannot be processed.

    How to fix this error?

    Check your entries. If necessary, assign company code &V2& to an FM
    area.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSZ1007 - WBS element &1 is not assigned to an FM area ?

    The SAP error message PSZ1007 indicates that a Work Breakdown Structure (WBS) element is not assigned to a Functional Area (FM area). This error typically occurs in the context of Project System (PS) and Funds Management (FM) modules when trying to perform operations that require a valid assignment of the WBS element to a specific FM area.

    Cause:

    1. Missing Assignment: The WBS element has not been assigned to any FM area in the system.
    2. Incorrect Configuration: The configuration settings for the WBS element or the FM area may not be set up correctly.
    3. Data Entry Error: There may have been an error during the creation or modification of the WBS element, leading to the omission of the FM area assignment.

    Solution:

    To resolve the PSZ1007 error, you can follow these steps:

    1. Check WBS Element Assignment:

      • Go to the transaction code CJ20N (Project Builder) or CJ02 (Change WBS Element).
      • Enter the WBS element number and check the details.
      • Ensure that the WBS element is assigned to the correct FM area.
    2. Assign FM Area:

      • If the WBS element is not assigned to an FM area, you can assign it by navigating to the relevant section in the WBS element details.
      • You may need to enter the appropriate FM area in the relevant field.
    3. Review Configuration:

      • Check the configuration settings for the WBS elements and FM areas in the system.
      • Ensure that the settings align with your organization's requirements and that the necessary links between WBS elements and FM areas are established.
    4. Consult Documentation:

      • Review SAP documentation or help resources for additional guidance on WBS elements and FM area assignments.
    5. Testing:

      • After making the necessary changes, test the functionality again to ensure that the error is resolved.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N, CJ02, and FMX1 (for FM area assignments).
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • User Roles: Ensure that you have the necessary authorizations to make changes to WBS elements and FM area assignments.
    • Training: If you are unfamiliar with the Project System or Funds Management modules, consider training or consulting with a colleague who has expertise in these areas.

    By following these steps, you should be able to resolve the PSZ1007 error and ensure that your WBS elements are correctly assigned to the appropriate FM areas.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker