Message type: E = Error
Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ
Message number: 007
Message text: WBS element &1 is not assigned to an FM area
WBS element &V1& is assigned to company code &V2&. This company code is
not assgined to an FM area.
WBS element &V1& cannot be processed.
Check your entries. If necessary, assign company code &V2& to an FM
area.
Error message extract from SAP system. Copyright SAP SE.
PSZ1007
- WBS element &1 is not assigned to an FM area ?The SAP error message PSZ1007 indicates that a Work Breakdown Structure (WBS) element is not assigned to a Functional Area (FM area). This error typically occurs in the context of Project System (PS) and Funds Management (FM) modules when trying to perform operations that require a valid assignment of the WBS element to a specific FM area.
Cause:
- Missing Assignment: The WBS element has not been assigned to any FM area in the system.
- Incorrect Configuration: The configuration settings for the WBS element or the FM area may not be set up correctly.
- Data Entry Error: There may have been an error during the creation or modification of the WBS element, leading to the omission of the FM area assignment.
Solution:
To resolve the PSZ1007 error, you can follow these steps:
Check WBS Element Assignment:
- Go to the transaction code
CJ20N
(Project Builder) orCJ02
(Change WBS Element).- Enter the WBS element number and check the details.
- Ensure that the WBS element is assigned to the correct FM area.
Assign FM Area:
- If the WBS element is not assigned to an FM area, you can assign it by navigating to the relevant section in the WBS element details.
- You may need to enter the appropriate FM area in the relevant field.
Review Configuration:
- Check the configuration settings for the WBS elements and FM areas in the system.
- Ensure that the settings align with your organization's requirements and that the necessary links between WBS elements and FM areas are established.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on WBS elements and FM area assignments.
Testing:
- After making the necessary changes, test the functionality again to ensure that the error is resolved.
Related Information:
CJ20N
, CJ02
, and FMX1
(for FM area assignments).By following these steps, you should be able to resolve the PSZ1007 error and ensure that your WBS elements are correctly assigned to the appropriate FM areas.
Get instant SAP help. Start your 7-day free trial now.
PSZ1006
WBS element &2 is not assigned to FM area &1
What causes this issue? WBS element &V2& is not assigned to company code &V3&. The company code is not assigned to FM area &V1&am...
PSZ1005
WBS element &1 not valid
What causes this issue? WBS element &V1& does not exist or is not assigned to controlling area &V2&.System Response INCLUDE NA_ALLG_...
PSZ1008
See error log
What causes this issue? An error has occurred.System Response INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TXHow to fix this error? View the error...
PSZ1009
Status forbids payment planning for WBS element &1
What causes this issue? The current status of WBS element &V1& prohibits transaction <ZK>FIPL Payment Planning</>.System Response...
Click on this link to search all SAP messages.