Do you have any question about this error?
Message type: E = Error
Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ
Message number: 006
Message text: WBS element &2 is not assigned to FM area &1
WBS element &V2& is not assigned to company code &V3&. The company code
is not assigned to FM area &V1&. Joint planning in manual payment
planning is only possible for WBS elements which are assigned to the
same FM area.
The FM area regarded by the system as valid is the FM area from the WBS
element selected first from the interval or group.
The system selects only the WBS elements assgined to FM area &V1&. If
no WBS element is so assigned by way of the company code, processing
stops.
Error message extract from SAP system. Copyright SAP SE.
PSZ1006
- WBS element &2 is not assigned to FM area &1 ?The SAP error message PSZ1006 indicates that a Work Breakdown Structure (WBS) element is not assigned to a specific Financial Management (FM) area. This error typically arises when you are trying to perform an operation related to project management or budgeting, and the system cannot find the necessary assignment between the WBS element and the FM area.
Cause:
- Missing Assignment: The WBS element you are trying to use is not linked to the specified FM area in the system.
- Incorrect Configuration: The configuration settings in the project system or financial management module may not be set up correctly.
- Data Entry Error: There may be a typographical error in the WBS element or FM area being referenced.
Solution:
Check WBS Element Assignment:
- Go to the WBS element in question and verify if it is assigned to the correct FM area. You can do this by navigating to the WBS element in the project system and checking its attributes.
- Use transaction code
CJ20N
(Project Builder) orCJ03
(Display WBS) to view the details of the WBS element.Assign WBS Element to FM Area:
- If the WBS element is not assigned to the FM area, you will need to assign it. This can typically be done in the WBS element settings or through the configuration settings in the project system.
- You may need to use transaction code
FMX1
(Create FM Area Assignment) to create the necessary assignment.Review Configuration:
- Ensure that the configuration for the project system and financial management is correctly set up. This may involve checking the settings in the IMG (Implementation Guide) under Project System and Financial Management.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific steps related to your version of SAP, as the process may vary slightly depending on the system configuration.
Check for User Authorizations:
- Ensure that you have the necessary authorizations to view and modify WBS elements and FM area assignments.
Related Information:
CJ20N
: Project BuilderCJ03
: Display WBSFMX1
: Create FM Area AssignmentBy following these steps, you should be able to resolve the PSZ1006 error and ensure that your WBS elements are correctly assigned to the appropriate FM areas.
Get instant SAP help. Start your 7-day free trial now.
PSZ1005
WBS element &1 not valid
What causes this issue? WBS element &V1& does not exist or is not assigned to controlling area &V2&.System Response INCLUDE NA_ALLG_...
PSZ1004
The specified group of WBS elements contains no valid entries
What causes this issue? Using the specified selection criteria, the system could not find any WBS element assigned to controlling area &V2&. ...
PSZ1007
WBS element &1 is not assigned to an FM area
What causes this issue? WBS element &V1& is assigned to company code &V2&. This company code is not assgined to an FM area.System Res...
PSZ1008
See error log
What causes this issue? An error has occurred.System Response INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TXHow to fix this error? View the error...
Click on this link to search all SAP messages.