How To Fix PSSC_GROSS040 - SSP &1 item &2 has a GED item in GED &3 starting too late


PSSC_GROSS040 - Overview

  • Message type: E = Error

  • Message class: PSSC_GROSS - Gross Entitlement and Payment

  • Message number: 040

  • Message text: SSP &1 item &2 has a GED item in GED &3 starting too late

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PSSC_GROSS040 - Details

  • The SAP error message PSSC_GROSS040 indicates that there is a timing issue with a GED (Gross Error Detection) item in the context of a specific SSP (Service and Support Process) item. This error typically arises when the GED item is scheduled to start later than the expected time frame for the associated SSP item.
    
    Cause: Timing Mismatch: The GED item is set to start after the SSP item, which violates the expected sequence of operations.
    Configuration Issues: There may be incorrect configurations in the scheduling or dependencies between the GED and SSP items. Data Entry Errors: Incorrect data entry during the creation or modification of the GED or SSP items can lead to this error.
    Solution: Check Scheduling: Review the start and end dates/times of the GED item and ensure that it is scheduled to start before or at the same time as the SSP item. Adjust Dependencies: If there are dependencies between the GED and SSP

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PSSC_GROSS040 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author