Message type: E = Error
Message class: PSS4_MSG - Message class for simplified Projects
Message number: 166
Message text: Grant & validity must overlap with the work package date range
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSS4_MSG166
- Grant & validity must overlap with the work package date range ?The SAP error message PSS4_MSG166, which states "Grant & validity must overlap with the work package date range," typically occurs in the context of project management or grant management within SAP. This error indicates that there is a mismatch between the validity period of a grant and the date range of a work package.
Cause: Date Mismatch: The validity period of the grant does not overlap with the start and end dates of the work package. This can happen if: The grant is set to be valid for a specific period that does not include the dates of the work package. The work package dates are incorrectly entered or do not align with the grant's validity.
Configuration Issues: There may be configuration settings in the SAP system that define how grants and work packages are related, and these settings may not be correctly aligned. Data Entry Errors: Incorrect data entry when creating or modifying either the
Get instant SAP help. Sign up for our Free Essentials Plan.
PSS4_MSG165
Fund &1 validity must overlap with the work package &2 date range
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG164
Functional Area & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG167
Functional Area & validity must overlap with the work package date range
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG168
Budget availability control settings for the project is not considered
What causes this issue? System Response Budget availability control settings for the project is not considered because public sector management (PSM)...
Click on this link to search all SAP messages.