Do you have any question about this error?
Message type: E = Error
Message class: PPEFLO - Messages for iPPE Application Object FLO
Message number: 404
Message text: Line explosion in execution mode is not allowed for &1 &2
You wish to explode a line structure with additional data for Logistics
Execution. However, such an explosion is not possible for objects that
are on lower levels than that of the line node.
Node &V1& &V2& is below a line node. This means that this object cannot
be exploded in execution mode.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO404
- Line explosion in execution mode is not allowed for &1 &2 ?The SAP error message PPEFLO404 indicates that a line explosion in execution mode is not allowed for the specified object (typically a production order or a planned order). This error usually occurs in the context of production planning and execution, particularly when trying to explode a bill of materials (BOM) or routing in a way that is not permitted by the system settings.
Cause:
- Execution Mode Restrictions: The error suggests that the system is trying to perform a line explosion (which involves breaking down a higher-level assembly into its components) while in a mode that does not allow it. This can happen if the system is set to a mode that restricts certain operations during execution.
- Configuration Settings: The configuration settings for the production order or the BOM may not allow for line explosions in the current context.
- Order Status: The status of the production order may not permit line explosions. For example, if the order is already in a certain status (like "Released" or "In Process"), the system may restrict further modifications.
- Missing Master Data: There may be missing or incorrect master data (like BOMs or routings) that prevents the line explosion from being executed.
Solution:
- Check Execution Mode: Verify the execution mode you are using. If you are in a mode that does not allow line explosions, switch to a mode that does (e.g., planning mode).
- Review Order Status: Check the status of the production order. If it is in a status that does not allow modifications, you may need to change the status or create a new order.
- Configuration Settings: Review the configuration settings for the production order and BOM. Ensure that they are set up to allow line explosions in the desired context.
- Master Data Verification: Ensure that all necessary master data (BOMs, routings, etc.) is correctly set up and available in the system.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the error and potential configuration settings that may need to be adjusted.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and setup of your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO403
Line explosion for &1 &2 is not allowed
What causes this issue? &V1& &V2& is an alternative, but it is not a part of line network. Line explosions are allowed only for nodes...
PPEFLO402
Line explosion: Invalid object type &1 (&2)
What causes this issue? Internal error that should not have occurred.System Response The system issues an error message and will not allow you to co...
PPEFLO405
Standard path indicator is missing for &1 &2. Alternative &3 selected
What causes this issue? &V1& &V2& is a <DS:GLOS.B12975DA5FD6D411BCBA0800060D9C68>multiple work center</>. In the case of ...
PPEFLO406
Standard path indicator not clear for &1 &2. Alternative &3 selected
What causes this issue? &V1& &V2& is a <DS:GLOS.B12975DA5FD6D411BCBA0800060D9C68>multiple work center.</> In the case of ...
Click on this link to search all SAP messages.