Do you have any question about this error?
Message type: E = Error
Message class: PPEFLO - Messages for iPPE Application Object FLO
Message number: 403
Message text: Line explosion for &1 &2 is not allowed
&V1& &V2& is an alternative, but it is not a part of line network. Line
explosions are allowed only for nodes or alternatives that are parts of
line networks.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO403
- Line explosion for &1 &2 is not allowed ?The SAP error message PPEFLO403 ("Line explosion for &1 &2 is not allowed") typically occurs in the context of production planning and control, particularly when dealing with the explosion of bills of materials (BOMs) or routing in the SAP system. This error indicates that the system is unable to perform a line explosion for the specified material and plant combination.
Causes:
- Configuration Issues: The configuration settings for the material or BOM may not allow for line explosions. This could be due to settings in the material master or BOM settings.
- Material Status: The material may have a status that prevents it from being exploded, such as being marked as inactive or blocked.
- BOM Structure: The BOM may not be properly structured or may be missing components, leading to issues during the explosion process.
- Routing Issues: If the routing associated with the material is not correctly defined or is missing, it can lead to this error.
- Plant-Specific Settings: The error may arise if the material is not defined for the specific plant in question.
Solutions:
- Check Material Master: Verify the material master data for the affected material. Ensure that the material is active and properly configured for production.
- Review BOM: Check the BOM for the material to ensure it is correctly defined and that all necessary components are included. Make sure the BOM is valid for the plant in question.
- Routing Verification: Ensure that the routing for the material is correctly defined and that it is valid for the production process you are trying to execute.
- Plant Settings: Confirm that the material is set up for the specific plant where the line explosion is being attempted. You may need to create or adjust the material master data for that plant.
- Consult Documentation: Review SAP documentation or help resources for any specific configuration settings related to line explosions and BOM processing.
- Error Logs: Check the system logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
CS03
(Display BOM), C202
(Display Routing), or MM03
(Display Material) to check the relevant data.By following these steps, you should be able to identify the root cause of the PPEFLO403 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPEFLO402
Line explosion: Invalid object type &1 (&2)
What causes this issue? Internal error that should not have occurred.System Response The system issues an error message and will not allow you to co...
PPEFLO401
Action points &1 (&2) and &3 (&4) are at the same position on the line
What causes this issue? Action point &V1& at &V2& and action point &V3& at &V4& are at exactly the same position in t...
PPEFLO404
Line explosion in execution mode is not allowed for &1 &2
What causes this issue? You wish to explode a line structure with additional data for Logistics Execution. However, such an explosion is not possible...
PPEFLO405
Standard path indicator is missing for &1 &2. Alternative &3 selected
What causes this issue? &V1& &V2& is a <DS:GLOS.B12975DA5FD6D411BCBA0800060D9C68>multiple work center</>. In the case of ...