How To Fix PPECHK406 - Activity &1 is not assigned to alternative line &2 between &3 and &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 406

  • Message text: Activity &1 is not assigned to alternative line &2 between &3 and &4

  • Show details Hide details
  • What causes this issue?

    A line structure contains alternative lines.
    The system has found
    line balance relationships to alternative line structures
    for the activity &V1&.
    However, the activity is not assigned to all alternative lines.
    The system has not found any line balance relationships
    to alternative line &V2& for the activity &V1&.

    System Response

    For the missing assignment,
    the system generates a default assignment for the activity to the
    alternative line. The system can then
    generate requirements in the Rapid Planning Matrix for the components
    that are assigned to this activity even if the order uses
    one of the alternative lines that has no line balance relationship.
    If the order does not use one of the alternative lines for
    which a line balance relationship exist, the activity is not included
    in activity confirmation or the activity matrix in the Rapid Planning
    Matrix. Only those activities for which an active line balance exists
    are considered.

    How to fix this error?

    Create the missing line balance relationship.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK406 - Activity &1 is not assigned to alternative line &2 between &3 and &4 ?

    The SAP error message PPECHK406 indicates that a specific activity is not assigned to an alternative line within a defined time frame. This error typically arises in the context of production planning and scheduling, particularly when working with alternative lines in a production process.

    Cause:

    The error occurs when:

    1. An activity (e.g., a specific task or operation) is expected to be executed on an alternative line, but it has not been assigned to that line.
    2. The time frame specified (between &3 and &4) does not include any valid assignments for the activity on the alternative line &2.
    3. There may be configuration issues in the production planning setup, such as missing or incorrect assignments in the routing or work center.

    Solution:

    To resolve the PPECHK406 error, you can take the following steps:

    1. Check Activity Assignment:

      • Go to the routing or work center configuration in SAP and verify that the activity &1 is correctly assigned to the alternative line &2.
      • Ensure that the assignment is valid for the specified time frame (between &3 and &4).
    2. Review Alternative Line Configuration:

      • Check the configuration of the alternative line to ensure it is set up correctly and that it can accommodate the activity in question.
      • Make sure that the alternative line is active and available for production during the specified time frame.
    3. Adjust Time Frame:

      • If the activity is indeed assigned but the time frame is incorrect, consider adjusting the time frame to include the valid assignment.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to production planning and scheduling for additional insights on managing activities and alternative lines.
    5. Testing:

      • After making the necessary adjustments, test the changes by attempting to execute the process again to see if the error persists.
    6. Seek Help from SAP Support:

      • If the issue remains unresolved, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CA01 (Create Routing), CA02 (Change Routing), or CR01 (Create Work Center) to manage routing and work center assignments.
    • SAP Notes: Check for any relevant SAP Notes that might address known issues or provide patches related to this error message.
    • Documentation: Review the SAP Help Portal for detailed information on production planning and alternative line management.

    By following these steps, you should be able to identify the root cause of the PPECHK406 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author