Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 404
Message text: Activity &1 has not been assigned a line object between &2 and &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPECHK404
- Activity &1 has not been assigned a line object between &2 and &3 ?The SAP error message PPECHK404 indicates that a specific activity (denoted by &1) has not been assigned a line object within a specified range (between &2 and &3). This error typically occurs in the context of production planning or project management within SAP, particularly when dealing with production orders, project structures, or similar scenarios.
Cause: Missing Assignment: The activity in question has not been properly assigned to a line object (such as a production order, project, or task). Incorrect Configuration: There may be issues with the configuration of the production planning or project management module, leading to missing or incorrect assignments. Data Integrity Issues: There could be inconsistencies in the master data or transactional data that prevent the system from recognizing the assignment. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or assign the activity to the line object.
Solution: Check Assignments: Verify that the activity is correctly assigned to the relevant
Get instant SAP help. Sign up for our Free Essentials Plan.
PPECHK403
Valid line balances for &1 &2 are not included for the explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK402
Production version &1, line &2: No valid line balance from &3 to &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK405
Mode &1 in &3 and mode &2 in &4 have different line activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK406
Activity &1 is not assigned to alternative line &2 between &3 and &4
What causes this issue? A line structure contains alternative lines. The system has found line balance relationships to alternative line structures f...
Click on this link to search all SAP messages.