Do you have any question about this error?
Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 403
Message text: Valid line balances for &1 &2 are not included for the explosion
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPECHK403
- Valid line balances for &1 &2 are not included for the explosion ?The SAP error message PPECHK403 indicates that there are valid line balances for a specific component (identified by &1 and &2) that are not included in the explosion process. This typically occurs in the context of production planning and control, particularly when dealing with the explosion of bills of materials (BOMs) in the Production Planning (PP) module.
Cause:
- Missing or Incorrect Data: The line balances for the specified component may not be correctly defined in the system. This could be due to missing data in the BOM or routing.
- Component Not Available: The component may not be available in the required quantity or may not be properly set up in the system.
- Configuration Issues: There may be configuration issues in the material master or BOM settings that prevent the system from recognizing the line balances.
- Status of the Component: The component might be in a status that does not allow it to be included in the explosion (e.g., inactive or obsolete).
- Planning Parameters: The planning parameters for the material may not be set correctly, leading to issues in the explosion process.
Solution:
- Check BOM and Routing: Verify that the BOM and routing for the material are correctly defined and that all components are included.
- Review Component Availability: Ensure that the component is available in the required quantity and is properly set up in the material master.
- Check Material Status: Confirm that the status of the component is active and that it is not marked as obsolete or inactive.
- Validate Configuration: Review the configuration settings in the material master and BOM to ensure they are set up correctly.
- Run MRP: If applicable, run the Material Requirements Planning (MRP) process to ensure that all components are planned correctly.
- Analyze Logs: Check the logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
CS03
(Display BOM), MD04
(Stock/Requirements List), and CO03
(Display Production Order) to investigate the issue further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
PPECHK402
Production version &1, line &2: No valid line balance from &3 to &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK401
&1 &2 has no valid line balance
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK404
Activity &1 has not been assigned a line object between &2 and &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK405
Mode &1 in &3 and mode &2 in &4 have different line activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.