Do you have any question about this error?
Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 405
Message text: Mode &1 in &3 and mode &2 in &4 have different line activities
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPECHK405
- Mode &1 in &3 and mode &2 in &4 have different line activities ?The SAP error message PPECHK405 indicates that there is a mismatch in the line activities between two different modes in a production planning scenario. This typically occurs in the context of Production Planning and Detailed Scheduling (PP/DS) when you are trying to compare or analyze different modes of production for a specific product or resource.
Cause:
The error arises when the system detects that the line activities (such as setup, production, or teardown activities) defined for one mode do not match those defined for another mode. This can happen due to:
- Configuration Issues: Different modes may have been configured with different sets of activities in the routing or production version.
- Data Inconsistencies: There may be inconsistencies in the master data, such as the routing or production version, leading to mismatched activities.
- Incorrect Mode Assignment: The modes assigned to the production process may not be correctly set up to handle the same line activities.
Solution:
To resolve the PPECHK405 error, you can take the following steps:
Check Routing and Production Versions:
- Go to the routing or production version for the affected product and verify that the line activities for both modes are consistent.
- Ensure that both modes have the same activities defined in the routing.
Review Mode Configuration:
- Check the configuration of the modes in the production planning settings. Make sure that the modes are set up to handle the same line activities.
Adjust Master Data:
- If there are discrepancies in the master data, update the routing or production version to ensure that both modes have the same line activities.
Consult Documentation:
- Review SAP documentation or help resources related to production planning and modes to ensure that you are following best practices.
Testing:
- After making changes, test the production planning scenario again to ensure that the error no longer occurs.
Related Information:
C223
(Change Routing) or C201
(Create Routing) to check and modify the routing.By following these steps, you should be able to identify and resolve the cause of the PPECHK405 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
PPECHK404
Activity &1 has not been assigned a line object between &2 and &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK403
Valid line balances for &1 &2 are not included for the explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK406
Activity &1 is not assigned to alternative line &2 between &3 and &4
What causes this issue? A line structure contains alternative lines. The system has found line balance relationships to alternative line structures f...
PPECHK407
Multiple work center &3: Modes &1 and &2 not allowed (line balance &4)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.