Do you have any question about this error?
Message type: E = Error
Message class: PM - Extended Payment Functions
Message number: 273
Message text: Optimization for a maximum of five days in advance
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PM273
- Optimization for a maximum of five days in advance ?The SAP error message PM273, which states "Optimization for a maximum of five days in advance," typically occurs in the context of production planning and scheduling within the SAP system, particularly when using the Capacity Planning or Production Planning modules. This error indicates that the system is attempting to perform an optimization that exceeds the allowed time frame of five days into the future.
Cause:
- Time Frame Exceeded: The primary cause of this error is that the optimization process is trying to schedule or plan production activities beyond the maximum allowed period of five days in advance.
- Configuration Settings: The system may be configured to limit planning horizons for certain operations or resources, which can lead to this error if the planning request exceeds that limit.
- Data Issues: There may be issues with the data being processed, such as incorrect dates or scheduling parameters that lead to an attempt to plan beyond the allowed time frame.
Solution:
- Adjust Planning Horizon: Review and adjust the planning horizon settings in the configuration. This may involve changing the parameters in the relevant planning profiles or settings to allow for a longer planning horizon if business processes require it.
- Limit Planning Requests: Ensure that any planning requests or optimization runs are limited to a maximum of five days in advance. This may involve modifying the scheduling logic or the parameters used in the planning run.
- Check Data Integrity: Verify that all relevant data (such as production orders, resources, and calendars) is correctly set up and does not contain any anomalies that could lead to scheduling beyond the allowed time frame.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to your version of SAP, as the exact steps may vary.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PM272
G/L account &1 not maintained for company code &2 in table TTRCD
What causes this issue? No entry exists in account table TTRCD for the bank account to be included in the cash deconcentration!System Response The s...
PM271
System error in lock management
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PM274
Enter valid currency code
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PM275
&1 is not a valid value; valid values are 0...5
What causes this issue? In cash deconcentration, optimization can only be planned a maximum of five days in advance. Valid values for the "numbe...
Click on this link to search all SAP messages.