Message type: E = Error
Message class: PM - Extended Payment Functions
Message number: 218
Message text: Calculated time period up to specified value date is &1 days
The number of work days between the posting date (execution date) and
required value date entered with the house bank under use of the valid
factory calendar amounts to &v1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PM218
- Calculated time period up to specified value date is &1 days ?The SAP error message PM218, which states "Calculated time period up to specified value date is &1 days," typically occurs in the context of Plant Maintenance (PM) when there is an issue with the time period calculations for maintenance tasks or notifications. This error can arise due to various reasons, including incorrect date entries, configuration issues, or data inconsistencies.
Cause:
- Incorrect Date Entry: The value date specified in the transaction may be set incorrectly, leading to an unexpected time period calculation.
- Configuration Issues: There may be issues with the configuration of the maintenance planning settings, such as the scheduling parameters or the maintenance plan settings.
- Data Inconsistencies: There could be inconsistencies in the master data related to the equipment or functional location, such as missing or incorrect maintenance intervals.
- System Settings: The system settings for time calculations may not be aligned with the business requirements, leading to discrepancies in the expected time periods.
Solution:
- Check Date Entries: Verify the value date entered in the transaction. Ensure that it is correct and falls within the expected range.
- Review Configuration: Check the configuration settings for maintenance planning in the SAP system. Ensure that the scheduling parameters and maintenance plan settings are correctly defined.
- Validate Master Data: Review the master data for the equipment or functional location involved. Ensure that all necessary fields are filled out correctly, including maintenance intervals and other relevant parameters.
- Adjust System Settings: If necessary, adjust the system settings related to time calculations to better align with your organization's requirements.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the PM218 error and related configuration settings.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
PM217
Flag 'TODAY' set, as calculated value date already overdue
What causes this issue? The 'TODAY' indicator (<LS>intended for immediate payments</>) is first set on the basis of the best-pr...
PM216
Flag "TODAY" set because calculated and required value date identical
What causes this issue? The TODAY indicator (<LS>only for immediate payments</>) is first set on the basis of the best-priced payment met...
PM219
Value date acc. to calculated date on &1
What causes this issue? The value date with the house bank is calculated in accordance with a particular payment method (see table TBKPD) and the spe...
PM220
Value date acc. to calculated date on &1 and therefore overdue
What causes this issue? The value date with the house bank is calculated in accordance with a particular payment method (see table TBKPD) and the spe...
Click on this link to search all SAP messages.