Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 212
Message text: Kanban container must not be unlocked because cntrl cycle is not released
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK212
- Kanban container must not be unlocked because cntrl cycle is not released ?The SAP error message PK212 indicates that a Kanban container cannot be unlocked because the control cycle associated with it is not released. This error typically occurs in the context of Kanban processing within SAP's production planning and control modules.
Cause:
The error arises when you attempt to unlock a Kanban container that is still linked to a control cycle that has not been released. In SAP, a control cycle defines the rules and parameters for the Kanban process, including how materials are managed and moved through the production process. If the control cycle is in a state that does not allow for the unlocking of the Kanban container, you will encounter this error.
Solution:
To resolve the PK212 error, you can follow these steps:
Check Control Cycle Status:
- Navigate to the control cycle associated with the Kanban container.
- Verify if the control cycle is in a "Released" status. If it is not, you will need to release it.
Release the Control Cycle:
- If the control cycle is not released, you can release it by using transaction code
PKMC
(for managing control cycles).- Find the relevant control cycle and change its status to "Released".
Unlock the Kanban Container:
- Once the control cycle is released, you should be able to unlock the Kanban container without encountering the error.
Check for Other Issues:
- If the control cycle is already released and you still encounter the error, check for any other dependencies or settings that might be affecting the Kanban container's status.
Related Information:
Transaction Codes:
PKMC
: Manage Control CyclesPK01
: Create KanbanPK02
: Change KanbanPK03
: Display KanbanDocumentation: Refer to SAP Help documentation for detailed information on Kanban processing and control cycles.
User Roles: Ensure that you have the necessary authorizations to change the status of control cycles and manage Kanban containers.
Consulting SAP Notes: If the issue persists, consider checking SAP Notes for any known issues or patches related to Kanban processing.
By following these steps, you should be able to resolve the PK212 error and successfully manage your Kanban containers.
Get instant SAP help. Start your 7-day free trial now.
PK211
Kanban container with ID number &1 does not exist
What causes this issue? You have entered an ID number for a kanban container either manually or using a bar code. However, this kanban container does...
PK210
Vendor &1 does not exist
What causes this issue? Vendor &V1& has not been maintained.System Response The system issues an error message and will not allow you to con...
PK213
Status "&1" cannot be prohibited for this process
What causes this issue? In the control cycle, you selected a status sequence that does not allow status "&V1&", however, at the sam...
PK214
Trigger qty must be smaller than kanban qty and greater than zero
What causes this issue? You have defined that replenishment is triggered when the kanban quantity reaches or exceeds a predefined trigger quantity. T...
Click on this link to search all SAP messages.