How To Fix PFM_01CA196 - Coverage &1-&2 increase created by change document &3


PFM_01CA196 - Overview

  • Message type: E = Error

  • Message class: PFM_01CA - Generic messages for developments

  • Message number: 196

  • Message text: Coverage &1-&2 increase created by change document &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PFM_01CA196 - Coverage &1-&2 increase created by change document &3 ?
    The SAP error message PFM_01CA196 typically relates to issues in the Public Sector Management (PSM) module, specifically concerning budget management and coverage increases. This error message indicates that a coverage increase has been created by a change document, which may not align with the expected budgetary controls or configurations.
    
    Cause:
    Configuration Issues: The error may arise due to incorrect configuration settings in the budget management or coverage settings. Authorization Problems: The user may not have the necessary authorizations to perform the action related to the coverage increase. Data Inconsistencies: There may be inconsistencies in the data related to the budget or coverage that prevent the system from processing the change document correctly. Change Document Issues: The change document referenced may have issues or may not be properly linked to the relevant budget or coverage.
    Solution: Check Configuration: Review the configuration settings for budget management and coverage in the SAP system. Ensure that they are set up correctly

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author