How To Fix PEP218 - Start time &1 is invalid (line &2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PEP - Schedule Manager: Messages

  • Message number: 218

  • Message text: Start time &1 is invalid (line &2)

  • Show details Hide details
  • What causes this issue?

    Enter the absolute start time with the format HHMMSS.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PEP218 - Start time &1 is invalid (line &2) ?

    The SAP error message PEP218 "Start time &1 is invalid (line &2)" typically occurs in the context of project management or planning within SAP, particularly when dealing with project events or activities. This error indicates that the start time specified for a particular event or activity is not valid, which can be due to several reasons.

    Causes:

    1. Incorrect Time Format: The start time may not be in the expected format (e.g., HH:MM).
    2. Date/Time Conflicts: The start time may fall outside the permissible range, such as being before the project start date or after the project end date.
    3. Missing Data: The required data for the start time may be missing or incorrectly entered.
    4. System Configuration: There may be configuration settings in the project management module that restrict valid time entries.
    5. Time Zone Issues: If the system is set to a different time zone, the entered time may not align with the expected time zone.

    Solutions:

    1. Check Time Format: Ensure that the start time is entered in the correct format (HH:MM) and is valid.
    2. Validate Dates: Verify that the start time is within the valid range of the project’s start and end dates.
    3. Review Input Data: Check for any missing or incorrect data entries related to the project or activity.
    4. Consult Configuration Settings: Review the project management configuration settings to ensure that they allow for the specified start time.
    5. Adjust Time Zone Settings: If applicable, check the time zone settings in the user profile and ensure they align with the project settings.

    Related Information:

    • Transaction Codes: You may need to use specific transaction codes related to project management (like CJ20N for project planning) to access and correct the data.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation for project management to understand the requirements for entering start times and other related data.
    • User Roles: Ensure that the user has the necessary permissions to make changes to project data.

    If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.