Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 217
Message text: Negative offset &1 mustr be exceed 31 days (line &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PEP217
- Negative offset &1 mustr be exceed 31 days (line &2) ?The SAP error message PEP217 indicates that there is an issue with a negative offset in a planning or scheduling context, specifically related to a time period that exceeds 31 days. This error typically arises in the context of project management or production planning when working with dates and offsets.
Cause:
The error occurs when a negative offset is applied to a date, and the resulting date calculation exceeds the allowed limit of 31 days. This can happen in various scenarios, such as:
- Incorrect Date Calculation: A formula or calculation that determines the start or end date of a task or project may be incorrectly set up, leading to an offset that is too large.
- Configuration Issues: The system configuration for planning or scheduling may not allow for negative offsets beyond a certain threshold.
- Data Entry Errors: Manual entry of dates or offsets may have been done incorrectly, leading to an invalid configuration.
Solution:
To resolve the PEP217 error, you can take the following steps:
Review Date Calculations: Check the calculations or formulas that are being used to determine the dates. Ensure that any negative offsets do not exceed the 31-day limit.
Adjust Offsets: If you find that the offset is indeed exceeding 31 days, adjust it to a valid range. This may involve changing the project plan or task scheduling.
Check Configuration Settings: Review the configuration settings in the SAP system related to planning and scheduling. Ensure that they are set up correctly to handle the required date ranges.
Data Validation: Validate the data entries for any tasks or projects that are causing the error. Ensure that all dates and offsets are entered correctly.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling date offsets in your version of SAP.
Seek Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the PEP217 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PEP216
Workdays or working days have not been entered as offset (line &)
What causes this issue? If you enter an absolute start time for the task, you also have to enter the offset of the task in work days or working days....
PEP215
A start time was not entered (line &)
What causes this issue? The start time for this task has not been specified. If you enter an offset in calendar or working days for the start time of...
PEP218
Start time &1 is invalid (line &2)
What causes this issue? Enter the absolute start time with the format HHMMSS.System Response The system issues an error message and will not allow y...
PEP219
The first day & in the calendar is invalid
What causes this issue? In the header data of the task list, you can determine which day is the first day of the calendar week: 0,,The week begins on...