Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 562
Message text: Enter a requirements type
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PE562
- Enter a requirements type ?The SAP error message PE562, which states "Enter a requirements type," typically occurs in the context of Material Requirements Planning (MRP) or when working with production planning and control in SAP. This error indicates that the system requires a requirements type to be specified for a particular operation or process, but it has not been provided.
Cause:
- Missing Requirements Type: The most common cause of this error is that the requirements type field is left blank when it is mandatory for the transaction you are trying to execute.
- Configuration Issues: There may be issues with the configuration of the MRP settings or the production planning settings in the system.
- Data Entry Errors: Users may inadvertently skip entering the requirements type due to oversight or misunderstanding of the field's importance.
Solution:
- Enter a Requirements Type: The immediate solution is to ensure that you enter a valid requirements type in the relevant field. This can usually be done in the transaction where the error occurs.
- Check Configuration: If you are unsure about what requirements type to enter, consult with your SAP configuration team to ensure that the requirements types are correctly set up in the system.
- Review Documentation: Refer to SAP documentation or user manuals related to the specific transaction you are working with to understand the requirements type and its significance.
- User Training: If this error occurs frequently, consider providing additional training for users on the importance of the requirements type and how to properly enter it in the system.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP and production planning.
Get instant SAP help. Sign up for our Free Essentials Plan.
PE561
Target plan not yet completed for all employees
What causes this issue? The target plan has not been completed for all employees. However, the actual plan can only be drawn up for 'completed...
PE560
Target plan already completed for one or more employees
What causes this issue? The target plan has already been completed for one or more employees. However, the target plan can only be drawn up for eithe...
PE563
Enter a shift group
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PE564
Shift &1 changed because of times in shift &2
What causes this issue? You have changed the times for shift &V1&.System Response Using the changed times as a basis, the system attempts to...
Click on this link to search all SAP messages.