Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 018
Message text: Network activity not yet released
Production planning has not yet been completed.
Production planners confirm the completion of production planning by
releasing a network activity. Network activities may only be started
once they have been released.
Release the network activity when engineering and production planning
have been completed (transaction <AB>CJ20N</>).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG018
- Network activity not yet released ?The SAP error message MPE_INSTALLATION_MSG018 with the description "Network activity not yet released" typically occurs in the context of SAP's Multi-Processing Environment (MPE) or during the installation or configuration of network-related activities. This error indicates that there are pending network activities that have not been released or completed, which can prevent further processing. Causes: Pending Network Activities: There may be network activities that are still in progress or have not been properly finalized.
Configuration Issues: Incorrect configuration settings in the network setup or in the MPE environment can lead to this error. System Lock: The system might be locked due to ongoing processes or transactions that have not been completed. Resource Constraints: Insufficient system resources (like memory or processing power) can lead to delays in releasing network activities. Solutions: Check Network Activities: Review the current network activities in the system. Ensure that all processes are completed and that there are no pending tasks. Release Pending Activities: If there
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_INSTALLATION_MSG017
BOM not exploded for network
What causes this issue? The BOM-PS interface has not yet been called.System Response This app supports management of projects for assembling major a...
MPE_INSTALLATION_MSG016
No latest BOM exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG019
Inconsistent parameter effectivity
What causes this issue? The network?s parameter effectivity was changed after the previous BOM explosion. This could have been an attempt to reassign...
MPE_INSTALLATION_MSG020
Different networks of same project have different parameter eff. value
What causes this issue? You have specified different parameter effectivity values for the networks of the same WBS element.System Response MRP canno...
Click on this link to search all SAP messages.