Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 017
Message text: BOM not exploded for network
The BOM-PS interface has not yet been called.
This app supports management of projects for assembling major
assemblies, whereby every major assembly consists of a set of
installation kits. The installation kits of a major assembly are defined
in the major assembly?s BOM.
Explode the major assembly?s BOM, either in this app or using the PEO
BOM transfer (transaction <AB>CN33_N</>).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG017
- BOM not exploded for network ?The SAP error message MPE_INSTALLATION_MSG017 indicates that a Bill of Materials (BOM) has not been exploded for a specific network in the context of project management or production planning. This error typically arises in scenarios where a network activity is linked to a BOM, but the system fails to explode the BOM for that network. Causes: Missing BOM: The BOM for the material or component linked to the network activity may not exist or may not be correctly defined in the system. Incorrect Configuration: The configuration settings for the network or the project may not be set up to allow BOM explosion. Status of the Network: The network might be in a status that does not allow BOM explosion (e.g., not released). Material Master Issues: The material master data for the components may not be correctly maintained, leading to issues in BOM explosion. Dependencies: There may be dependencies or conditions that prevent the BOM from being
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_INSTALLATION_MSG016
No latest BOM exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG015
BOM version is outdated
What causes this issue? You have updated the BOM, but you have not yet re-exploded it.System Response Production engineers create BOMs for major ass...
MPE_INSTALLATION_MSG018
Network activity not yet released
What causes this issue? Production planning has not yet been completed.System Response Production planners confirm the completion of production plan...
MPE_INSTALLATION_MSG019
Inconsistent parameter effectivity
What causes this issue? The network?s parameter effectivity was changed after the previous BOM explosion. This could have been an attempt to reassign...
Click on this link to search all SAP messages.