Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 017
Message text: BOM not exploded for network
The BOM-PS interface has not yet been called.
This app supports management of projects for assembling major
assemblies, whereby every major assembly consists of a set of
installation kits. The installation kits of a major assembly are defined
in the major assembly?s BOM.
Explode the major assembly?s BOM, either in this app or using the PEO
BOM transfer (transaction <AB>CN33_N</>).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG017
- BOM not exploded for network ?The SAP error message MPE_INSTALLATION_MSG017 indicates that a Bill of Materials (BOM) has not been exploded for a specific network in the context of project management or production planning. This error typically arises in scenarios where a network activity is linked to a BOM, but the system fails to explode the BOM for that network.
Causes:
- Missing BOM: The BOM for the material or component linked to the network activity may not exist or may not be correctly defined in the system.
- Incorrect Configuration: The configuration settings for the network or the project may not be set up to allow BOM explosion.
- Status of the Network: The network might be in a status that does not allow BOM explosion (e.g., not released).
- Material Master Issues: The material master data for the components may not be correctly maintained, leading to issues in BOM explosion.
- Dependencies: There may be dependencies or conditions that prevent the BOM from being exploded, such as missing components or incorrect routing.
Solutions:
- Check BOM Existence: Verify that the BOM exists for the material in question. You can do this by using transaction code CS03 (Display BOM) to check if the BOM is correctly defined.
- Review Network Configuration: Ensure that the network is configured correctly to allow BOM explosion. Check the settings in the project definition and network activities.
- Release the Network: If the network is not released, release it to allow for BOM explosion. You can do this using transaction code CN22 (Change Network).
- Material Master Verification: Check the material master data for the components involved. Ensure that all necessary data is maintained and that the material is active.
- Check Dependencies: Review any dependencies or conditions that might be preventing the BOM from being exploded. This may involve checking routing, component availability, and other related settings.
- Use Transaction Codes: Utilize relevant transaction codes such as C223 (Assign BOM to Network) to ensure that the BOM is correctly assigned to the network.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG016
No latest BOM exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_INSTALLATION_MSG015
BOM version is outdated
What causes this issue? You have updated the BOM, but you have not yet re-exploded it.System Response Production engineers create BOMs for major ass...
MPE_INSTALLATION_MSG018
Network activity not yet released
What causes this issue? Production planning has not yet been completed.System Response Production planners confirm the completion of production plan...
MPE_INSTALLATION_MSG019
Inconsistent parameter effectivity
What causes this issue? The network?s parameter effectivity was changed after the previous BOM explosion. This could have been an attempt to reassign...