Do you have any question about this error?
Message type: E = Error
Message class: MLCCS - Message for Actual Costing
Message number: 042
Message text: Split for preliminary valuation in currency &2 not found
The actual cost component split for the material is managed in plant
&v1&. The system was unable to find the cost component split for the
preliminary valuation in currency &v2&.
In order not to prevent further processing (release of standard cost
estimate, release of future valuation price or price change) the
material ledger continues to use cost component split at the old
standard price for the preliminary valuation. However, this can lead to
an incorrect cost component split for this period.
This problem does not have any influence on the release of a standard
cost estimate.
Contact your system administrator so that in consultation with SAP
Support you can deal with the inconsistent status as quickly as
possible.
Error message extract from SAP system. Copyright SAP SE.
MLCCS042
- Split for preliminary valuation in currency &2 not found ?The SAP error message MLCCS042, which states "Split for preliminary valuation in currency &2 not found," typically occurs in the context of Material Ledger and is related to the valuation of materials in different currencies. This error indicates that the system is unable to find a split for the preliminary valuation in the specified currency.
Cause:
- Missing Configuration: The error often arises when the necessary configuration for currency splits in the Material Ledger is not set up correctly. This can happen if the currency settings for the material or the valuation area are incomplete or incorrect.
- Currency Type Issues: The currency type used for the valuation may not be defined or may not have a corresponding split entry in the system.
- Data Inconsistencies: There may be inconsistencies in the data related to the material or the valuation area, such as missing entries in the Material Ledger tables.
Solution:
Check Material Ledger Configuration:
- Go to the configuration settings for the Material Ledger (Transaction code: OML0).
- Ensure that the currency settings for the valuation area and the material are correctly defined.
- Verify that the necessary currency types are activated and configured properly.
Review Currency Types:
- Check the currency types defined in the system (Transaction code: OB08).
- Ensure that the currency type used for the preliminary valuation is available and correctly set up.
Check Material Master Data:
- Review the material master data (Transaction code: MM03) for the affected material.
- Ensure that the valuation class and other relevant settings are correctly maintained.
Analyze Material Ledger Documents:
- Use transaction code CKM3N to analyze the Material Ledger documents for the affected material.
- Look for any discrepancies or missing entries that could lead to the error.
Run Consistency Checks:
- Use transaction code CKMLCP to run consistency checks for the Material Ledger.
- This can help identify and resolve any inconsistencies in the data.
Consult SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional guidance.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MLCCS041
Preliminary valuation with rescaled split in currency &2
What causes this issue? The actual cost component split for the material is managed in company code &v1&. The system could not transfer the c...
MLCCS040
Preliminary valuation with rescaled split in currency &2
What causes this issue? The actual cost component split is managed in plant &v1& for the material. The system was unable to tranfer the cost ...
MLCCS043
Split for preliminary valuation in currency &2 not found
What causes this issue? The actual cost component split for the material is managed in company code &v1&. The system was unable to find the c...
MLCCS050
Price of consumed materials will be negative
What causes this issue? You want to complete single/ or multilevel price determination. In the relevant period, the ending inventory price is supplie...
Click on this link to search all SAP messages.