Do you have any question about this error?
Message type: E = Error
Message class: MLCCS - Message for Actual Costing
Message number: 043
Message text: Split for preliminary valuation in currency &2 not found
The actual cost component split for the material is managed in company
code &v1&. The system was unable to find the cost component split for
the preliminary valuation in currency &v2&.
In order not to prevent further processing (release of standard cost
estimate, release of future valuation price or price change) the
material ledger continues to use cost component split at the old
standard price for the preliminary valuation. However, this can lead to
an incorrect cost component split for this period.
This problem does not have any influence on the release of a standard
cost estimate.
Contact your system administrator so that in consultation with SAP
Support you can deal with the inconsistent status as quickly as
possible.
Error message extract from SAP system. Copyright SAP SE.
MLCCS043
- Split for preliminary valuation in currency &2 not found ?The SAP error message MLCCS043 indicates that there is an issue with the preliminary valuation of a material in a specific currency. This error typically arises in the context of Material Ledger (ML) when the system is unable to find a split for the preliminary valuation in the specified currency.
Cause:
- Missing Currency Split: The primary cause of this error is that the system cannot find a corresponding split for the preliminary valuation in the specified currency. This can happen if the currency is not properly configured or if the necessary data for that currency is missing.
- Configuration Issues: There may be issues with the configuration of the Material Ledger or the valuation methods being used.
- Data Inconsistencies: Inconsistencies in the data, such as missing entries in the Material Ledger tables, can also lead to this error.
- Currency Translation Issues: If there are issues with currency translation settings or if the currency is not supported in the current configuration, this error may occur.
Solution:
- Check Currency Configuration: Ensure that the currency in question is properly configured in the system. This includes checking the settings in the Material Ledger and ensuring that the currency is active and valid.
- Review Material Ledger Settings: Verify the settings for the Material Ledger, including the valuation methods and any relevant configuration that may affect currency splits.
- Data Consistency Check: Perform a consistency check on the Material Ledger data. This can involve checking for missing entries or discrepancies in the valuation data.
- Update or Create Currency Splits: If necessary, update or create the required currency splits for the preliminary valuation. This may involve entering missing data or adjusting existing entries.
- Consult Documentation: Refer to SAP documentation or notes related to the Material Ledger and currency valuation for additional guidance and troubleshooting steps.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific notes or patches that address the issue.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MLCCS042
Split for preliminary valuation in currency &2 not found
What causes this issue? The actual cost component split for the material is managed in plant &v1&. The system was unable to find the cost com...
MLCCS041
Preliminary valuation with rescaled split in currency &2
What causes this issue? The actual cost component split for the material is managed in company code &v1&. The system could not transfer the c...
MLCCS050
Price of consumed materials will be negative
What causes this issue? You want to complete single/ or multilevel price determination. In the relevant period, the ending inventory price is supplie...
MLCCS051
Ending inventory price from Business Add In is negative
What causes this issue? You want to complete single/ or multilevel price determination. The Business Add-In has delivered a negative ending inventory...