Message type: E = Error
Message class: ML4HMASTER - Message Class for ML4H Masterdata
Message number: 108
Message text: Perform the preparation for material &1 in run &2 first
You want to perform the settlement for material &V1& in costing run &V2&
. However, you have not performed the preparation of settlement for the
material in this costing run.
The system does not allow the settlement for the material.
Perform the preparation of settlement for material &V1& in costing run
&V2& first.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ML4HMASTER108
- Perform the preparation for material &1 in run &2 first ?The SAP error message ML4HMASTER108 indicates that there is a prerequisite step that needs to be completed before you can perform the operation you are attempting. Specifically, it suggests that you need to perform the preparation for the material specified (denoted as &1) in the run specified (denoted as &2) before proceeding.
Cause: This error typically occurs in the context of Material Ledger (ML) processing, particularly when dealing with material valuation or inventory management. The error indicates that the necessary preparatory steps for the material in question have not been completed. This could be due to: Missing Preparation Steps: The required preparatory run for the material has not been executed. Incorrect Sequence of Operations: The operations are being performed in the wrong order, where the preparation step must precede the current operation.
Configuration Issues: There may be configuration settings in the Material Ledger that are not set up correctly.
Solution: To resolve this error, you should follow
Get instant SAP help. Sign up for our Free Essentials Plan.
ML4HMASTER107
Close previous period for activity &1 first
What causes this issue? You want to perform a preparation of settlement for activity type/business process &V1& in costing run &V2&. ...
ML4HMASTER106
Close previous period for material &1 first
What causes this issue? You want to perform a preparation of settlement for material &V1& in costing run &V2&. However, you have not ...
ML4HMASTER109
Perform the preparation for activity &1 in run &2 first
What causes this issue? You want to perform settlement for activity type/business process &V1& in costing run &V2&. However, you have...
ML4HMASTER110
Reverse the closing entry before removing material &1 from run &2
What causes this issue? According to this selection, material &V1& is no longer relevant for costing run &V2&. However, you have alre...
Click on this link to search all SAP messages.