Do you have any question about this error?
Message type: E = Error
Message class: ML4HMASTER - Message Class for ML4H Masterdata
Message number: 106
Message text: Close previous period for material &1 first
You want to perform a preparation of settlement for material &V1& in
costing run &V2&. However, you have not posted the closing entries for
the material in the previous period.
The system does not allow the preparation of settlement for the
material.
Post the closing entries for material &V1& in the previous period first.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ML4HMASTER106
- Close previous period for material &1 first ?The SAP error message ML4HMASTER106 indicates that you are trying to perform an operation on a material that cannot be processed because the previous period has not been closed. This typically occurs in the context of Material Ledger (ML) and inventory management, where the system requires that all transactions for a given period be finalized before moving on to the next period.
Cause:
The error is triggered when:
To resolve this error, you need to follow these steps:
Close the Previous Period:
Check for Open Transactions:
Post Necessary Transactions:
Re-attempt the Operation:
Transaction Codes:
Material Ledger Configuration:
Documentation:
User Roles:
By following these steps, you should be able to resolve the error and proceed with your transactions in SAP.
Get instant SAP help. Start your 7-day free trial now.
ML4HMASTER105
Settle activity &1 in run &2 first
What causes this issue? You want to post the closing entries for activity type/business process &V1& in costing run &V2&. However, yo...
ML4HMASTER104
Settle material &1 in run &2 first
What causes this issue? You want to post the closing entries for material &V1& in costing run &V2&. However, you have not settled the...
ML4HMASTER107
Close previous period for activity &1 first
What causes this issue? You want to perform a preparation of settlement for activity type/business process &V1& in costing run &V2&. ...
ML4HMASTER108
Perform the preparation for material &1 in run &2 first
What causes this issue? You want to perform the settlement for material &V1& in costing run &V2& . However, you have not performed th...
Click on this link to search all SAP messages.