Do you have any question about this error?
Message type: E = Error
Message class: MEPO - New Purchase Order Dialog
Message number: 158
Message text: Handover date is earlier than or the same as the goods issue date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MEPO158
- Handover date is earlier than or the same as the goods issue date ?The SAP error message MEPO158 indicates that there is a discrepancy between the handover date and the goods issue date in a purchasing or logistics process. Specifically, it means that the handover date you are trying to enter is either earlier than or the same as the goods issue date, which is not allowed in the system.
Cause:
- Date Entry Error: The handover date has been incorrectly entered as a date that is the same as or earlier than the goods issue date.
- System Configuration: There may be specific business rules or configurations in your SAP system that enforce this date relationship.
- Process Flow Issues: The sequence of operations in the logistics process may not be followed correctly, leading to incorrect date entries.
Solution:
- Check Dates: Review the handover date and the goods issue date. Ensure that the handover date is set to a date that is later than the goods issue date.
- Correct Entry: If the handover date is incorrect, update it to a valid date that meets the requirement.
- Review Process: Ensure that the logistics process is being followed correctly. If the goods issue has already occurred, the handover date should logically be set to a later date.
- Consult Documentation: If you are unsure about the correct dates, consult your internal documentation or speak with a colleague who is familiar with the process.
- System Configuration: If you believe the error is due to system configuration, consult with your SAP administrator or technical team to review the settings related to date validations.
Related Information:
By following these steps, you should be able to resolve the MEPO158 error and proceed with your transaction in SAP.
Get instant SAP help. Start your 7-day free trial now.
MEPO157
Handover date is later than the delivery date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MEPO156
Date/quantity fix set, although no confirmation found
What causes this issue? You are processing a stock transport order item and have selected the <DS:DE.ME_FIXMG>Fix Date/Quantity</>checkbo...
MEPO159
Handover time is later than the time of delivery
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MEPO160
Handover time is earlier than the time of the goods issue
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.