Do you have any question about this error?
Message type: E = Error
Message class: MDGBP - Master Data Governance: Business Partner specific messages
Message number: 067
Message text: There is no valid relationship
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MDGBP067
- There is no valid relationship ?The SAP error message MDGBP067 ("There is no valid relationship") typically occurs in the context of Material Requirements Planning (MRP) or when dealing with the Bill of Materials (BOM) in SAP. This error indicates that the system cannot find a valid relationship between the components and the parent material in the BOM or the planning data.
Causes:
- Missing BOM: The BOM for the material may not be created or may not be valid for the specified plant or version.
- Incorrect Validity Dates: The validity dates of the BOM may not cover the date of the planning run.
- Inactive BOM: The BOM might be inactive or not released for use.
- Incorrect Material Master Data: The material master data may not be correctly set up, leading to issues in finding relationships.
- Configuration Issues: There may be configuration issues in the MRP settings or in the way the materials are linked.
Solutions:
- Check BOM Existence: Verify that the BOM exists for the material in question. You can do this using transaction code
CS03
(Display BOM).- Validate BOM Status: Ensure that the BOM is active and released. If it is not, you may need to activate or release it.
- Check Validity Dates: Make sure that the validity dates of the BOM cover the planning period you are working with.
- Review Material Master Data: Check the material master data for the parent and component materials to ensure they are correctly configured.
- MRP Configuration: Review the MRP configuration settings to ensure that they are set up correctly for the materials involved.
- Use Transaction MD04: Use transaction
MD04
to check the stock/requirements list for the material and see if there are any discrepancies.- Consult Documentation: Refer to SAP documentation or help resources for more detailed troubleshooting steps related to your specific version of SAP.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and MD01
(MRP Run).If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP and BOM processes.
Get instant SAP help. Start your 7-day free trial now.
MDGBP066
You may only change validity dates
What causes this issue? When you are carrying out relationship maintenance not in dialog mode, you should change other data besides validity data. If...
MDGBP065
Differentiation criterion &1 &2 is not in work area
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MDGBP068
There is no valid role determination
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MDGBP069
Enter at least one change document type
What causes this issue? You must specify whether change documents or scheduled changes are to be displayed.System Response The system issues an erro...
Click on this link to search all SAP messages.