How To Fix MD428 - &1: &2 (S9)


MD428 - Overview

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 428

  • Message text: &1: &2 (S9)

  • Show details Hide details
  • What causes this issue?

    The following reasons exist:
    Either a component of the planned order or production order entered is
    identical to the material that is to be produced on this basis of this
    order, or
    the low-level code of the component is smaller than the low-level code
    of the material produced.
    In the first case, recursiveness occurs, in the second case, it is
    possible.

    System Response

    To avoid an endless loop, the dependent requirement is not taken into
    account. The receipt elements that cover this dependent requirement are
    therefore also not displayed in the order report.

    How to fix this error?

    Please check the low-level codes of the materials in question.
    &ANNOTATION&
    This message is only used in the order report and not in the MRP list
    or in the current stock/requirements list.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MD428 - &1: &2 (S9) ?
    The SAP error message MD428 typically relates to issues in the Material Requirements Planning (MRP) process, specifically concerning the availability of materials or the planning of production orders. The error message format you provided indicates that there are two variables (&1 and &2) that would provide more context about the specific issue.
    
    Cause: Material Availability: The error may indicate that the required quantity of a material is not available for the planned production or sales order. Planning Parameters: Incorrect planning parameters or settings in the material master data could lead to this error. Stock Levels: The stock levels may not meet the requirements due to previous consumption, incorrect stock postings, or unplanned demand. MRP Type: The MRP type assigned to the material may not be appropriate for the planning strategy being used.
    Solution: Check Material Availability: Verify the stock levels of the material in question. Use transaction codes like MMBE to check stock status. Review MRP Settings: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • MD427 &1: &2 (P4)
    What causes this issue? The production finish date calculated using the routing lies after the order finish date that was calculated using the in-hou...

  • MD426 &1: &2 (P3)
    What causes this issue? In Customizing, no specification has been made to allow the adjustment of the order start date to the production start date. ...

  • MD429 &1: &2 (U6)
    What causes this issue? In the individual segment (make-to-order planning, individual project planning, or direct production or direct procurement), ...

  • MD430 &1: &2 (C1)
    What causes this issue? The maximum release quantity of the source of supply for this receipt has been exceeded. In the quota file, you can specify m...

Click on this link to search all SAP messages.