Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 113
Message text: No system resources for parallel step &1
You have scheduled the template allocation as a background job with the
server group &V3&. This leads to parallel processing. The scheduling of
the prallel step &V1& failed after &V2& attempts due to a lack of
system resources in the server group &V3&.
The parallel processing cannot be completed or is not possible.
Repeat the template allocation (if appropriate, only for the affected
selection packages) and choose another server group that has more
system resources.
Error message extract from SAP system. Copyright SAP SE.
KW113
- No system resources for parallel step &1 ?The SAP error message KW113 "No system resources for parallel step &1" typically indicates that the system has reached its limit for parallel processing resources. This can occur in various scenarios, such as when executing background jobs, parallel processing tasks, or when using certain SAP functionalities that require parallel execution.
Cause: Resource Limitations: The system has a defined limit on the number of parallel processes that can be executed at the same time. If this limit is reached, additional requests will be queued or rejected, leading to the KW113 error. Configuration Settings: The configuration settings for parallel processing may not be optimized for the current workload. System Performance: High system load or insufficient hardware resources (CPU, memory) can also lead to this error. Job Scheduling: If too many jobs are scheduled to run in parallel, it can exhaust the available resources.
Solution: Check and Adjust Parallel Processing Settings: Go to transaction RZ10 to check the profile parameters related
Get instant SAP help. Sign up for our Free Essentials Plan.
KW112
System error: &1 when parallel step &4 was received
What causes this issue? When parallel step &V4& was received, a system error occurred: Error text: &V2&&V3&System Response P...
KW111
System error: &1 when parallel step &4 was scheduled
What causes this issue? When you scheduled parallel step &V4&, a system error occurred. Error text: &V2&&V3&System Response ...
KW114
Not possible to find suitable package sizes for parallel processing
What causes this issue? You have scheduled the template allocation in Profitability Analysis as a background job and specified a server group. This l...
KW115
No suitable summarization levels
What causes this issue? No suitable summarization level for template allocation to profitability analysis.System Response The system tries to read t...
Click on this link to search all SAP messages.