Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 112
Message text: System error: &1 when parallel step &4 was received
When parallel step &V4& was received, a system error occurred:
Error text: &V2&&V3&
Processing of parallel step &V4& could not be completed.
Repeat processing for the objects selected in the parallel step (see
job log).
SY-SUBRC = &V1&
Error message extract from SAP system. Copyright SAP SE.
KW112
- System error: &1 when parallel step &4 was received ?The SAP error message KW112, which states "System error: &1 when parallel step &4 was received," typically indicates an issue related to parallel processing in SAP, particularly in the context of background jobs or parallel processing steps in workflows.
Cause:
- System Resource Issues: The error may occur due to insufficient system resources (CPU, memory, etc.) when trying to execute parallel steps.
- Configuration Issues: There may be misconfigurations in the parallel processing settings or in the job scheduling.
- Database Locking: If the parallel step is trying to access a resource that is locked by another process, it can lead to this error.
- Program Errors: There could be bugs or issues in the ABAP program or function module being executed in the parallel step.
- Transport Issues: If the system has recently undergone a transport, there may be inconsistencies in the objects involved.
Solution:
- Check System Resources: Monitor the system's performance and resource usage. If resources are low, consider optimizing the workload or increasing system capacity.
- Review Job Configuration: Ensure that the parallel processing settings are correctly configured. Check the job definitions and parameters.
- Analyze Logs: Look into the job logs and system logs (transaction SM37 for job monitoring) to identify any specific issues or errors that occurred before KW112.
- Debugging: If you have access to the ABAP code, consider debugging the program or function module that is causing the error to identify any logical issues.
- Database Locks: Use transaction SM12 to check for any locks that might be causing the issue. If necessary, release locks that are no longer needed.
- Transport Consistency: If the error started occurring after a transport, check for inconsistencies in the transported objects. You may need to re-transport or adjust the objects.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to contact SAP support for further assistance, providing them with detailed logs and error messages for a more in-depth analysis.
Get instant SAP help. Start your 7-day free trial now.
KW111
System error: &1 when parallel step &4 was scheduled
What causes this issue? When you scheduled parallel step &V4&, a system error occurred. Error text: &V2&&V3&System Response ...
KW110
No detail list for parallel processing
What causes this issue? You have scheduled the template allocation as a background job with server group &V1&. This leads to parallel process...
KW113
No system resources for parallel step &1
What causes this issue? You have scheduled the template allocation as a background job with the server group &V3&. This leads to parallel pro...
KW114
Not possible to find suitable package sizes for parallel processing
What causes this issue? You have scheduled the template allocation in Profitability Analysis as a background job and specified a server group. This l...
Click on this link to search all SAP messages.