Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 286
Message text: Iteration terminated after &V1& steps
The iteration of &V3& in controlling area &V2& was exited after &V1&
steps. After these steps, the convergence criterion is not yet
completely reached. A delta of &V4& remains.
The prices are established based on the currently calculated values.
Check the results; you can still update price calculation if the
results are precise enough. You can also start the divergence analysis
to trace possible loops that cause a divergence.
Error message extract from SAP system. Copyright SAP SE.
KP286
- Iteration terminated after &V1& steps ?The SAP error message KP286, which states "Iteration terminated after &V1& steps," typically occurs in the context of cost planning or cost center accounting when the system is unable to converge on a solution after a specified number of iterations. This can happen during the execution of planning functions that require iterative calculations, such as when using the cost planning functionality in SAP Controlling (CO).
Causes:
- Complexity of the Model: The planning model may be too complex, leading to difficulties in convergence.
- Incorrect Data: There may be incorrect or incomplete data in the master data or transaction data that affects the calculations.
- Parameter Settings: The settings for the planning run may not be optimal, such as the maximum number of iterations allowed.
- Circular References: There may be circular references in the planning logic that prevent the system from reaching a solution.
- Resource Limitations: Insufficient system resources (memory, processing power) can also lead to this error.
Solutions:
- Review Data: Check the master data and transaction data for completeness and correctness. Ensure that all necessary data is available for the planning run.
- Adjust Iteration Settings: Increase the maximum number of iterations allowed in the planning settings. This can sometimes help the system to converge on a solution.
- Simplify the Model: If possible, simplify the planning model to reduce complexity. This may involve breaking down the planning process into smaller, more manageable parts.
- Check for Circular References: Review the planning logic for any circular references and resolve them.
- Monitor System Resources: Ensure that the system has adequate resources to perform the calculations. This may involve checking memory usage and processing power during the planning run.
- Use Debugging Tools: Utilize SAP debugging tools to trace the execution of the planning function and identify where the process is failing.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KP285
Activity relationship with different object currencies
What causes this issue? In the price calculation, you specified that the object currency amounts are to be iterated independently. This function only...
KP284
Posting of predistribution of fixed costs resulted in error
What causes this issue? An error occurred while the system was updating the predistribution of fixed costs.System Response The update is not complet...
KP287
Calculated activity price is too big
What causes this issue? The price for &V1& calculated within price calculation is so high that it exceeds the field limits.System Response T...
KP288
Field overflow with iteration
What causes this issue? Within the iteration for the price calculation resp. for the plan reconciliation, a field overflow occurred for the allocatio...
Click on this link to search all SAP messages.