Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 287
Message text: Calculated activity price is too big
The price for &V1& calculated within price calculation is so high that
it exceeds the field limits.
To prevent a field overflow and therefore an abnormal termination, the
price is set to 0. A possibly planned update is not carried out.
Check the cost debits and the activity quantities for &V1&. The problem
might be caused by an error in planning.
Error message extract from SAP system. Copyright SAP SE.
KP287
- Calculated activity price is too big ?The SAP error message KP287, which states "Calculated activity price is too big," typically occurs in the context of cost planning or activity-based costing in SAP. This error indicates that the calculated price for an activity exceeds the maximum allowable limit set in the system.
Causes:
- High Activity Costs: The activity price calculated based on the input costs (like labor, materials, overhead) is excessively high due to incorrect or unrealistic input values.
- Configuration Limits: The system has predefined limits for activity prices, and the calculated price exceeds these limits.
- Data Entry Errors: Incorrect data entry in cost centers, activity types, or master data can lead to inflated activity prices.
- Currency Conversion Issues: If there are issues with currency conversion rates or if the currency settings are incorrect, it may lead to inflated prices.
- Cost Element Issues: Incorrectly configured cost elements or cost centers can also lead to erroneous calculations.
Solutions:
- Review Input Data: Check the input data for the activity types and cost centers involved. Ensure that the costs entered are realistic and accurate.
- Adjust Configuration Settings: If the calculated price is valid but exceeds the configured limits, consider adjusting the maximum allowable price in the configuration settings.
- Check Currency Settings: Ensure that the currency settings and conversion rates are correct. Verify that the currency used in the calculations is consistent with the master data.
- Analyze Cost Elements: Review the cost elements associated with the activity. Ensure they are correctly configured and that there are no discrepancies.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to activity pricing.
- Test with Sample Data: If possible, test the calculations with sample data to identify where the issue may be occurring.
Related Information:
By following these steps, you should be able to identify the cause of the KP287 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
KP286
Iteration terminated after &V1& steps
What causes this issue? The iteration of &V3& in controlling area &V2& was exited after &V1& steps. After these steps, the co...
KP285
Activity relationship with different object currencies
What causes this issue? In the price calculation, you specified that the object currency amounts are to be iterated independently. This function only...
KP288
Field overflow with iteration
What causes this issue? Within the iteration for the price calculation resp. for the plan reconciliation, a field overflow occurred for the allocatio...
KP289
Process special periods and normal periods separately
What causes this issue? You have called up the predistribution of fixed costs for the periods &V3& through &V4&. In the controlling a...
Click on this link to search all SAP messages.